Auscultation of the RTH flotation tailing dump in Bor with reference to the stability of dams and dykes at the tailing dump
The RTH flotation tailing dump, located in the old open pit RTH in Bor about 500 m southeast of the Flotation Plant, has been in continuous operational work since 1985. The flotations tailing dumps are important mining facilities that are constantly changed during their exploitation period. Due to t...
Main Authors: | Obradović Ljubiša, Milutinović Sandra, Magdalinović Srđana, Petrović Sanja |
---|---|
Format: | Article |
Language: | English |
Published: |
Mining and Metallurgy Institute, Bor
2022-01-01
|
Series: | Mining and Metallurgy Engineering Bor |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2022/2334-88362202059O.pdf |
Similar Items
-
Hydrogeological analysis of the existing state of drainage with a new system of wells for lowering the groundwater level of the RTH flotation tailing dump in Bor
by: Tašić Dušan, et al.
Published: (2023-01-01) -
Possibility of rehabilitation and overhang the dam 6 at the "Valja Fundata" tailing dump in Majdanpek
by: Milutinović Sandra, et al.
Published: (2023-01-01) -
Impact of the flotation tailing dumps on the living environment of Bor and protective measures
by: Lekovski Ružica, et al.
Published: (2013-01-01) -
Remediation the tailing dump RTH in terms of stability
by: Rajković Radmilo, et al.
Published: (2014-01-01) -
Conceptual design of hydrotechnical installation for sprinkling the tailing dump in the mines and flotation plant Kopaonik - Leposavić
by: Rajković Branislav, et al.
Published: (2024-01-01)