Disaster mechanism during passing of working face under overlying remnant coal pillar and advanced regional prevention technology
When the mining of the underlying working face of shallow and close seam passes under the overlying remnant coal pillar, it is easy to have an intensive mine pressure-induced dynamic disaster, resulting in personnel and equipment damage, which seriously threatens the safety of mine production. The c...
Main Authors: | Huan YANG, Kaige ZHENG, Bingang LI, Yanjun LI, Sen YANG, Zeyang WANG, Haojie WANG, Nan DAI |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Coal Science and Technology
2023-09-01
|
Series: | Meitan kexue jishu |
Subjects: | |
Online Access: | http://www.mtkxjs.com.cn/article/doi/10.12438/cst.2022-1373 |
Similar Items
-
Research on Roof Load Transfer by Passing Coal Pillar of Working Face in Shallow Buried Closely Multiple-Seam
by: Yanpeng He, et al.
Published: (2023-01-01) -
Hydraulic fracturing method for relieving stress concentration in remaining coal pillar in overlying goaf
by: Luying Shao, et al.
Published: (2024-04-01) -
Coevolution mechanism and branch of pillar‐overburden fissures in shallow coal seam mining
by: Jie Zhang, et al.
Published: (2023-05-01) -
Extraction of the remnant coal pillar in regular and irregular shapes : a case study
by: Chen, Yong, et al.
Published: (2020) -
Study on reasonable width of coal pillar under water-rock interaction
by: KONG Fanlong, et al.
Published: (2022-12-01)