Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah

Earthmoving work is often performed based on simple calculation and experience. This practice may work on a small project. However, for a big project in which a large excavation volume must be accomplished, managing the work become more complex. Some different equipment in various types and sizes ne...

Full description

Bibliographic Details
Main Authors: Arief Setiawan Budi Nugroho, Akhmad Aminullah
Format: Article
Language:English
Published: University of Brawijaya 2021-06-01
Series:Rekayasa Sipil
Subjects:
Online Access:https://rekayasasipil.ub.ac.id/index.php/rs/article/view/855
_version_ 1798016387238592512
author Arief Setiawan Budi Nugroho
Akhmad Aminullah
author_facet Arief Setiawan Budi Nugroho
Akhmad Aminullah
author_sort Arief Setiawan Budi Nugroho
collection DOAJ
description Earthmoving work is often performed based on simple calculation and experience. This practice may work on a small project. However, for a big project in which a large excavation volume must be accomplished, managing the work become more complex. Some different equipment in various types and sizes need to be assigned. Project managers should determine the best combination of equipment with the correct amount to achieve a satisfactory result. This research was conducted to optimize the productivity-cost index in earthmoving works using a discrete event simulation (DES) analysis in four different schemes. An underpass project in Yogyakarta was used as the case study. The optimal combination of equipment was determined by the highest value of the productivity-cost index. The result shows that the highest productivity-cost index of 18.22 was achieved by the combination of four big excavators and 90 small trucks (2E4 90D1). It offered a better productivity-cost index compare to the contractors existing equipment combination which could only reach a productivity-cost index of 5.3.
first_indexed 2024-04-11T15:49:56Z
format Article
id doaj.art-2f4b6038557b4e499dc2cbb6a1c765dd
institution Directory Open Access Journal
issn 1978-5658
2502-6348
language English
last_indexed 2024-04-11T15:49:56Z
publishDate 2021-06-01
publisher University of Brawijaya
record_format Article
series Rekayasa Sipil
spelling doaj.art-2f4b6038557b4e499dc2cbb6a1c765dd2022-12-22T04:15:21ZengUniversity of BrawijayaRekayasa Sipil1978-56582502-63482021-06-0115214214910.21776/ub.rekayasasipil.2021.015.02.9Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan TanahArief Setiawan Budi Nugroho0Akhmad Aminullah1Universitas Gadjah MadaUniversitas Gadjah MadaEarthmoving work is often performed based on simple calculation and experience. This practice may work on a small project. However, for a big project in which a large excavation volume must be accomplished, managing the work become more complex. Some different equipment in various types and sizes need to be assigned. Project managers should determine the best combination of equipment with the correct amount to achieve a satisfactory result. This research was conducted to optimize the productivity-cost index in earthmoving works using a discrete event simulation (DES) analysis in four different schemes. An underpass project in Yogyakarta was used as the case study. The optimal combination of equipment was determined by the highest value of the productivity-cost index. The result shows that the highest productivity-cost index of 18.22 was achieved by the combination of four big excavators and 90 small trucks (2E4 90D1). It offered a better productivity-cost index compare to the contractors existing equipment combination which could only reach a productivity-cost index of 5.3.https://rekayasasipil.ub.ac.id/index.php/rs/article/view/855discrete event simulationearthmovingproductivity-cost indexoptimization in construction
spellingShingle Arief Setiawan Budi Nugroho
Akhmad Aminullah
Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah
Rekayasa Sipil
discrete event simulation
earthmoving
productivity-cost index
optimization in construction
title Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah
title_full Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah
title_fullStr Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah
title_full_unstemmed Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah
title_short Penggunaan Simulasi Komputer Untuk Optimalisasi Kebutuhan Alat Berat Pekerjaan Pemindahan Tanah
title_sort penggunaan simulasi komputer untuk optimalisasi kebutuhan alat berat pekerjaan pemindahan tanah
topic discrete event simulation
earthmoving
productivity-cost index
optimization in construction
url https://rekayasasipil.ub.ac.id/index.php/rs/article/view/855
work_keys_str_mv AT ariefsetiawanbudinugroho penggunaansimulasikomputeruntukoptimalisasikebutuhanalatberatpekerjaanpemindahantanah
AT akhmadaminullah penggunaansimulasikomputeruntukoptimalisasikebutuhanalatberatpekerjaanpemindahantanah