Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage

Iraq is a wide country in the area and construction projects have been distributed in many places, therefore this research studies the ability to use advanced communication tools such as computer-mediated communication instead of traditional communication (Face To Face). Revit application which bas...

Full description

Bibliographic Details
Main Authors: Wadhah A. Hatem, Hafadh I. Naji, Zainab A. Abd Alkreem
Format: Article
Language:English
Published: University of Diyala 2018-06-01
Series:Diyala Journal of Engineering Sciences
Subjects:
Online Access:https://djes.info/index.php/djes/article/view/147
_version_ 1811183145285844992
author Wadhah A. Hatem
Hafadh I. Naji
Zainab A. Abd Alkreem
author_facet Wadhah A. Hatem
Hafadh I. Naji
Zainab A. Abd Alkreem
author_sort Wadhah A. Hatem
collection DOAJ
description Iraq is a wide country in the area and construction projects have been distributed in many places, therefore this research studies the ability to use advanced communication tools such as computer-mediated communication instead of traditional communication (Face To Face). Revit application which based on BIM technology have been used , this application helped in exchange design information between designer and site engineer for in making decisions , solving problems ,reduce wasted time and reduce the expenses that occur as a result of the use of FTF communication .The results concluded from this research are that communication quantity in FTF was more than in CMC where Total Number of Words (TNOW) were in FTF 303 while in CMC 246 , The percentage of Number of Work Related Words said in CMC is higher than in FTF, it was 87% in CMC and 81% in FTF of the (TNOW) , it is indicating that communication in CMC more productive than communication in FTF, in addition to that the working time in CMC were (262 seconds every 5-minutes) slightly higher than in FTF were (252 seconds every 5-minutes), this  explains that CMC was slightly more productive than FTF . Wasted time for FTF consistently higher than wasted time in CMC  ,where the averages of wasted time spent for every 5 minutes were 32 second in FTF and 21 in CMC ,this is due to that FTF was easier than CMC in terms of social speech. To identify  degree collaboration between users in two methods by the total number of exchanges in CMC was higher than in FTF because most of the persons were having more interaction when using CMC.
first_indexed 2024-04-11T09:41:51Z
format Article
id doaj.art-2f8624e1aa814a02a89b8159b0653759
institution Directory Open Access Journal
issn 1999-8716
2616-6909
language English
last_indexed 2024-04-11T09:41:51Z
publishDate 2018-06-01
publisher University of Diyala
record_format Article
series Diyala Journal of Engineering Sciences
spelling doaj.art-2f8624e1aa814a02a89b8159b06537592022-12-22T04:31:10ZengUniversity of DiyalaDiyala Journal of Engineering Sciences1999-87162616-69092018-06-0111210.24237/djes.2018.11202Using of Advanced Communication Technology in the Construction Projects During the Implementation StageWadhah A. Hatem0Hafadh I. Naji1Zainab A. Abd Alkreem2Technical Institute, Middle technical University,Baquba Diyala University, college of engineeringDiyala University, college of engineering Iraq is a wide country in the area and construction projects have been distributed in many places, therefore this research studies the ability to use advanced communication tools such as computer-mediated communication instead of traditional communication (Face To Face). Revit application which based on BIM technology have been used , this application helped in exchange design information between designer and site engineer for in making decisions , solving problems ,reduce wasted time and reduce the expenses that occur as a result of the use of FTF communication .The results concluded from this research are that communication quantity in FTF was more than in CMC where Total Number of Words (TNOW) were in FTF 303 while in CMC 246 , The percentage of Number of Work Related Words said in CMC is higher than in FTF, it was 87% in CMC and 81% in FTF of the (TNOW) , it is indicating that communication in CMC more productive than communication in FTF, in addition to that the working time in CMC were (262 seconds every 5-minutes) slightly higher than in FTF were (252 seconds every 5-minutes), this  explains that CMC was slightly more productive than FTF . Wasted time for FTF consistently higher than wasted time in CMC  ,where the averages of wasted time spent for every 5 minutes were 32 second in FTF and 21 in CMC ,this is due to that FTF was easier than CMC in terms of social speech. To identify  degree collaboration between users in two methods by the total number of exchanges in CMC was higher than in FTF because most of the persons were having more interaction when using CMC. https://djes.info/index.php/djes/article/view/147CommunicationCollaborationFTFCMC
spellingShingle Wadhah A. Hatem
Hafadh I. Naji
Zainab A. Abd Alkreem
Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage
Diyala Journal of Engineering Sciences
Communication
Collaboration
FTF
CMC
title Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage
title_full Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage
title_fullStr Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage
title_full_unstemmed Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage
title_short Using of Advanced Communication Technology in the Construction Projects During the Implementation Stage
title_sort using of advanced communication technology in the construction projects during the implementation stage
topic Communication
Collaboration
FTF
CMC
url https://djes.info/index.php/djes/article/view/147
work_keys_str_mv AT wadhahahatem usingofadvancedcommunicationtechnologyintheconstructionprojectsduringtheimplementationstage
AT hafadhinaji usingofadvancedcommunicationtechnologyintheconstructionprojectsduringtheimplementationstage
AT zainabaabdalkreem usingofadvancedcommunicationtechnologyintheconstructionprojectsduringtheimplementationstage