Analysis of Energy Efficient Scheduling of the Manufacturing Line with Finite Buffer Capacity and Machine Setup and Shutdown Times
The aim of this paper is to present a model of energy efficient scheduling for series production systems during operation, including setup and shutdown activities. The flow shop system together with setup, shutdown times and energy consumption are considered. Production tasks enter the system with e...
Main Authors: | Adrian Kampa, Iwona Paprocka |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-11-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/21/7446 |
Similar Items
-
The Method of Production Scheduling with Uncertainties Using the Ants Colony Optimisation
by: Iwona Paprocka, et al.
Published: (2020-12-01) -
Multi-Objective Hybrid Flow-Shop Scheduling in Parallel Sequential Mode While Considering Handling Time and Setup Time
by: Yingjie Feng, et al.
Published: (2023-03-01) -
A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages
by: Mona Jabbari, et al.
Published: (2022-01-01) -
Non-permutation flow shop scheduling problem with preemption-dependent processing time
by: Mohsen Ziaee, et al.
Published: (2016-12-01) -
A Hybrid Method for the Parallel-Flow Shop-Scheduling Problem
by: Milad Mansouri, et al.
Published: (2023-04-01)