Fire risk assessment in Tehran metro line 1 (rectifier substation) with fault tree analysis
Background and a ims: Subway system including infrastructure systems in the transportation industry can potentially exposed to fire, flood, earthquake and similar events and could create catastrophic losses to society. Therefore, this study aims to assess the risk of fire in Tehran subway stations (...
Main Authors: | B Mortazavi, S Daneshvar, S Atr kar Roshan |
---|---|
Format: | Article |
Language: | fas |
Published: |
Iran University of Medical Sciences
2014-06-01
|
Series: | Salāmat-i kār-i Īrān |
Subjects: | |
Online Access: | http://ioh.iums.ac.ir/article-1-924-en.html |
Similar Items
-
Fire Risk Assessment and Its Economic Loss Estimation in Tehran Subway, Applying Event Tree Analysis
by: Sedigheh Atrkar Roshan, et al.
Published: (2015-01-01) -
The Design Method of Traction Power Supplies in Integrated Metro Systems
by: Dong Doan Van, et al.
Published: (2023-06-01) -
Fault tree analysis for subway fire evacuation with agent-based modeling
by: Yaning Qiao, et al.
Published: (2023-02-01) -
Traveling Wave-Based Fault Location for Gas Insulated Substations
by: Diogo Gonzaga Marcelo, et al.
Published: (2024-01-01) -
Summary of Grounding Fault Finding Strategies in Substation DC System
by: Yuan CHENG, et al.
Published: (2023-09-01)