Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning
PT "X" on the weaving department had oven the material accumulation was caused by buying material is over. Another always have under capacity work time result cut back schedule material shipping. So that needs arrangement adjustment from fist capacity and needs. And than recalculation, amo...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2008-02-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/6090 |
_version_ | 1818701629225959424 |
---|---|
author | Arif Hartono |
author_facet | Arif Hartono |
author_sort | Arif Hartono |
collection | DOAJ |
description | PT "X" on the weaving department had oven the material accumulation was caused by buying material is over. Another always have under capacity work time result cut back schedule material shipping. So that needs arrangement adjustment from fist capacity and needs. And than recalculation, amount ordering material in order to not happened material accumulation. MRP method use for determine exact lot sizing. The comprise amount ordering and frequency ordering. Compare the suggestion cost before suggestion lot sizing occur fist lot sizing, so can determine lot sizing method use balanced between load and capacity. Add load and capacity or decrease load and capacity. From comparison fist capacity and suggestion capacity so can a profit capacity. Based on the analysis we can know on the suggestion lot sizing have efficiency 78.26% concerning fist lot sizing. The suggestion capacity experience decrease 17.14% from fist capacity. And than efficiency labor force cost 13.55% occur fist labor force cost. |
first_indexed | 2024-12-17T15:23:52Z |
format | Article |
id | doaj.art-306c345851ff4f76a310c24a978fe362 |
institution | Directory Open Access Journal |
issn | 1978-1431 2527-4112 |
language | English |
last_indexed | 2024-12-17T15:23:52Z |
publishDate | 2008-02-01 |
publisher | Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang |
record_format | Article |
series | Jurnal Teknik Industri |
spelling | doaj.art-306c345851ff4f76a310c24a978fe3622022-12-21T21:43:19ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122008-02-0181465210.22219/JTIUMM.Vol8.No1.46-524635Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement PlanningArif HartonoPT "X" on the weaving department had oven the material accumulation was caused by buying material is over. Another always have under capacity work time result cut back schedule material shipping. So that needs arrangement adjustment from fist capacity and needs. And than recalculation, amount ordering material in order to not happened material accumulation. MRP method use for determine exact lot sizing. The comprise amount ordering and frequency ordering. Compare the suggestion cost before suggestion lot sizing occur fist lot sizing, so can determine lot sizing method use balanced between load and capacity. Add load and capacity or decrease load and capacity. From comparison fist capacity and suggestion capacity so can a profit capacity. Based on the analysis we can know on the suggestion lot sizing have efficiency 78.26% concerning fist lot sizing. The suggestion capacity experience decrease 17.14% from fist capacity. And than efficiency labor force cost 13.55% occur fist labor force cost.http://ejournal.umm.ac.id/index.php/industri/article/view/6090capacity, MRP, method, material, load |
spellingShingle | Arif Hartono Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning Jurnal Teknik Industri capacity, MRP, method, material, load |
title | Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning |
title_full | Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning |
title_fullStr | Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning |
title_full_unstemmed | Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning |
title_short | Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning |
title_sort | perencanaan dan pengendalian produksi grey cloth dengan metode capacity requirement planning |
topic | capacity, MRP, method, material, load |
url | http://ejournal.umm.ac.id/index.php/industri/article/view/6090 |
work_keys_str_mv | AT arifhartono perencanaandanpengendalianproduksigreyclothdenganmetodecapacityrequirementplanning |