Perencanaan dan Pengendalian Produksi Grey Cloth Dengan Metode Capacity Requirement Planning
PT "X" on the weaving department had oven the material accumulation was caused by buying material is over. Another always have under capacity work time result cut back schedule material shipping. So that needs arrangement adjustment from fist capacity and needs. And than recalculation, amo...
Main Author: | Arif Hartono |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2008-02-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/6090 |
Similar Items
-
Perencanaan Pengendalian Persediaan Bahan Baku dengan Metode Manufacturing Resource Planning
by: Andri Sulaksmi
Published: (2009-02-01) -
PERENCANAAN PERSEDIAAN BAHAN BAKU DENGAN MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) PRODUK KACANG SHANGHAI PADA PERUSAHAAN GANGSAR NGUNUT-TULUNGAGUNG
by: Asvin Wahyuni, et al.
Published: (2015-10-01) -
Application of the Materials Requirement Planning (MRP) in the Pharmaceutical Laboratory Oriente
by: Elena Saumell–Fonseca, et al.
Published: (2015-12-01) -
From Christian Social Order to Humane Democracy Three Itineraries Leading to the MRP 1936-1948
by: Arthur Plaza
Published: (2005-12-01) -
PERENCANAAN DAN PENGENDALIAN BAHAN BAKU UNTUK MENINGKATKAN EFISIENSI PRODUKSI DENGAN METODE MATERIAL REQUIREMENT PLANNING DAN ANALYTICAL HIERARCHY PROCESS DI PT. XYZ
by: Muhamad Adi Sungkono, et al.
Published: (2016-04-01)