Comparative optimization of mining the Kraku Bugaresku Cementation deposit using Whittle and NPV Scheduler software
The paper is aimed to present a method of determining the final pit contour with maximum discounted profit, to determine the stages of excavation (Pushbacks) and mining schedule for the final pit using the software packages for strategic planning of open pit mining - Whittle and NPV Scheduler, in th...
Main Authors: | Kostić Vedran, Vaduvesković Zoran |
---|---|
Format: | Article |
Language: | English |
Published: |
Mining and Metallurgy Institute, Bor
2014-01-01
|
Series: | Mining and Metallurgy Engineering Bor |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2014/2334-88361402061K.pdf |
Similar Items
-
Analysis the possibility of improving the economic indicators of exploitation the deposit Cementacija Kraku Bugaresku - Ore field Cerovo
by: Vaduvesković Zoran, et al.
Published: (2014-01-01) -
Conversion of flotation processing using the heap leaching method in the mine Cementacija - Kraku Bugaresku in the Copper mine Bor
by: Vaduvesković Zoran, et al.
Published: (2015-01-01) -
Algorithm of optimization the open pits using the computer programs Whittle and Gemcom
by: Rajković Radmilo, et al.
Published: (2014-01-01) -
NPV analysis of multiple surface constraints for pit expansion scenarios under geological uncertainty
by: Bruno Tomasi Kuckartz, et al. -
Economic effect of modification the optimal contour of the Open Pit South Mining District Majdanpek, Republic of Serbia
by: Kržanović Daniel, et al.
Published: (2024-01-01)