Clash Cost Analysis in Electrical Installations Based on BIM Technologies
One of the core features of delivering a Building Information Modelling (BIM) project is design coordination and clash detection. In the traditional way of conducting investments, the design process consists in the separate work of individual industry specialists on an individual part of the project...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-02-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/15/5/1679 |
_version_ | 1827651580259729408 |
---|---|
author | Tadeusz Daszczyński Michał Ostapowski Aleksander Szerner |
author_facet | Tadeusz Daszczyński Michał Ostapowski Aleksander Szerner |
author_sort | Tadeusz Daszczyński |
collection | DOAJ |
description | One of the core features of delivering a Building Information Modelling (BIM) project is design coordination and clash detection. In the traditional way of conducting investments, the design process consists in the separate work of individual industry specialists on an individual part of the project and checking its compliance with coordination checkpoints. Building information modelling/management is emerging as an innovative way to virtually design and manage projects. Clashes are one of the most problematic elements in construction. They can interfere in the decision-making process by generating unexpected costs of additional materials, work and actions. The purpose of the following paper is to analyze the impact of BIM on limiting cost of clashes and also to check how clashes affect the unforeseen costs of a construction investment and how the BIM methodology can help to reduce them, especially in electrical installations. Basic construction collisions with algorithms of their solutions were presented. The possible financial benefits associated with the use of the BIM approach have been described using mathematical relationships. |
first_indexed | 2024-03-09T20:41:39Z |
format | Article |
id | doaj.art-30d370e485634be0b6ce7a2ac47ebc78 |
institution | Directory Open Access Journal |
issn | 1996-1073 |
language | English |
last_indexed | 2024-03-09T20:41:39Z |
publishDate | 2022-02-01 |
publisher | MDPI AG |
record_format | Article |
series | Energies |
spelling | doaj.art-30d370e485634be0b6ce7a2ac47ebc782023-11-23T22:55:51ZengMDPI AGEnergies1996-10732022-02-01155167910.3390/en15051679Clash Cost Analysis in Electrical Installations Based on BIM TechnologiesTadeusz Daszczyński0Michał Ostapowski1Aleksander Szerner2Department of Electrical Engineering, Institute of Electrical Power Engineering, Warsaw University of Technology, 00-662 Warsaw, PolandDepartment of Electrical Engineering, Institute of Electrical Power Engineering, Warsaw University of Technology, 00-662 Warsaw, PolandBIM Association, 02-316 Warsaw, PolandOne of the core features of delivering a Building Information Modelling (BIM) project is design coordination and clash detection. In the traditional way of conducting investments, the design process consists in the separate work of individual industry specialists on an individual part of the project and checking its compliance with coordination checkpoints. Building information modelling/management is emerging as an innovative way to virtually design and manage projects. Clashes are one of the most problematic elements in construction. They can interfere in the decision-making process by generating unexpected costs of additional materials, work and actions. The purpose of the following paper is to analyze the impact of BIM on limiting cost of clashes and also to check how clashes affect the unforeseen costs of a construction investment and how the BIM methodology can help to reduce them, especially in electrical installations. Basic construction collisions with algorithms of their solutions were presented. The possible financial benefits associated with the use of the BIM approach have been described using mathematical relationships.https://www.mdpi.com/1996-1073/15/5/1679clash analysisAECBIMcost analysiselectrical installations |
spellingShingle | Tadeusz Daszczyński Michał Ostapowski Aleksander Szerner Clash Cost Analysis in Electrical Installations Based on BIM Technologies Energies clash analysis AEC BIM cost analysis electrical installations |
title | Clash Cost Analysis in Electrical Installations Based on BIM Technologies |
title_full | Clash Cost Analysis in Electrical Installations Based on BIM Technologies |
title_fullStr | Clash Cost Analysis in Electrical Installations Based on BIM Technologies |
title_full_unstemmed | Clash Cost Analysis in Electrical Installations Based on BIM Technologies |
title_short | Clash Cost Analysis in Electrical Installations Based on BIM Technologies |
title_sort | clash cost analysis in electrical installations based on bim technologies |
topic | clash analysis AEC BIM cost analysis electrical installations |
url | https://www.mdpi.com/1996-1073/15/5/1679 |
work_keys_str_mv | AT tadeuszdaszczynski clashcostanalysisinelectricalinstallationsbasedonbimtechnologies AT michałostapowski clashcostanalysisinelectricalinstallationsbasedonbimtechnologies AT aleksanderszerner clashcostanalysisinelectricalinstallationsbasedonbimtechnologies |