Financial Feasibility Study between Purchasing and Hiring LNG Carrier In Iranian LNG Industry
LNG chain value consists of gas exploration, gas liquefaction, transportation, Re-gasification and finally gas distribution to the end user network. Transportation part of this chain normally consists of 25 to 30% of the total vale and is the most lucrative part of it. As proved Iranian gas reserves...
Main Authors: | Meysam Kamalinejad, Ali Sheykhbahaee, Said Mazaheri |
---|---|
Format: | Article |
Language: | English |
Published: |
Iranian Association of Naval Architecture and Marine Engineering
2016-03-01
|
Series: | International Journal of Coastal and Offshore Engineering |
Subjects: | |
Online Access: | http://ijcoe.org/article-1-68-en.html |
Similar Items
-
LIQUIFIED NATURAL GAS (LNG) CARRIERS
by: Daniel Posavec, et al.
Published: (2010-12-01) -
The Mooring Pattern Study for Q-Flex Type LNG Carriers Scheduled for Berthing at Ege Gaz Aliaga LNG Terminal
by: Selcuk Nas, et al.
Published: (2014-12-01) -
Comparative safety assessment of LNG re-liquefaction systems applied on LNG carriers
by: Nikolaos Kapellas, et al.
Published: (2022-10-01) -
Study on the LNG distribution to Mobile Power Plants using a Small-Scale LNG Carrier for the case of the Sulawesi region of Indonesia
by: Muhammad Arif Budiyanto, et al.
Published: (2022-04-01) -
Simulation Tests of Determining Under Keel Clearance for LNG Carrier at Anchorage
by: Piotr Mrozowski, et al.
Published: (2020-12-01)