Planning of Rigid Pavement Thickness in The Construction of The Sp. Door - Sp. Benakat Penungkal Regency Abab Lematang Ilir

The access section to Benakat Village, Pali Regency is a special road made by the company, with the condition of the existing land being unpaved with a length of 1,375 meters and a width of 7 meters, and has severe damage triggered by vehicles with excess capacity or ODOL (Over Dimension Over Load)...

Full description

Bibliographic Details
Main Authors: Sartika Nisumanti, Lilly Julian, Khodijah Al Qubroh
Format: Article
Language:English
Published: Yayasan Pendidikan Riset dan Pengembangan Intelektual (YRPI) 2022-10-01
Series:Journal of Applied Engineering and Technological Science
Subjects:
Online Access:https://yrpipku.com/journal/index.php/jaets/article/view/1065
Description
Summary:The access section to Benakat Village, Pali Regency is a special road made by the company, with the condition of the existing land being unpaved with a length of 1,375 meters and a width of 7 meters, and has severe damage triggered by vehicles with excess capacity or ODOL (Over Dimension Over Load)) that pass through that path. The purpose of this study was to determine the results of the calculation of rigid pavement thickness planning by comparing the 1993 AASHTO and 2017 MDPJ methods so that the road Sp. Doors – Sp. Benakat is able to accommodate ODOL vehicles. This study uses AASHTO 1993 and MDPJ 2017 as methods to produce rigid pavement thickness (Rigid Pavement) so that ODOL vehicles can pass. Based on the results of data analysis and calculations, the input indicators in each method are different for each method so that AASHTO 1993 produces a thickness of 35 cm, and in MDPJ it produces a thickness of 28.5 cm
ISSN:2715-6087
2715-6079