Rapid Truck Loading for Efficient Feedstock Logistics

A multi-bale handling unit offers an advantage for the efficient hauling of round bales. Two empty racks on trailers are left at a satellite storage location for loading while a truck tractor delivers two loaded racks to the biorefinery, thus uncoupling the loading and hauling operations and increas...

Full description

Bibliographic Details
Main Authors: Robert “Bobby” Grisso, John Cundiff, Subhash C. Sarin
Format: Article
Language:English
Published: MDPI AG 2021-03-01
Series:AgriEngineering
Subjects:
Online Access:https://www.mdpi.com/2624-7402/3/2/10
_version_ 1827696620721930240
author Robert “Bobby” Grisso
John Cundiff
Subhash C. Sarin
author_facet Robert “Bobby” Grisso
John Cundiff
Subhash C. Sarin
author_sort Robert “Bobby” Grisso
collection DOAJ
description A multi-bale handling unit offers an advantage for the efficient hauling of round bales. Two empty racks on trailers are left at a satellite storage location for loading while a truck tractor delivers two loaded racks to the biorefinery, thus uncoupling the loading and hauling operations and increasing the efficiency of both. The projected 10 min trailer exchange time equals the projected 10 min unload time at the biorefinery achieved by lifting off the two full racks and replacing them with two empties, a technology adapted from the container shipping industry. A concept is presented for a bale loader that latches onto the rack/trailer and loads bales into the bottom tier chambers. This machine will load 10 bales into the rack on the front trailer by attaching on to the front of the trailer and 10 bales into the rear trailer by attaching onto the rear. A telehandler removes bales from single-layer storage and places them in the bale loader to load the bottom tier compartments. The top tier compartments are loaded directly from the top. Expectations are that an experienced operator can average 9 loads in a 10 h workday, and load-out cost is estimated as 3.61 USD/Mg, assuming the average achieved load-out productivity over annual operation is 60% of optimum productivity (24 Mg/h) equal to 14.4 Mg/h. Cost increases to 4.81 USD/Mg when the productivity factor drops to 45%, and cost is 3.09 USD/Mg for a factor of 70%.
first_indexed 2024-03-10T12:52:04Z
format Article
id doaj.art-3177697a02bd4a198b379fb070cfd4b3
institution Directory Open Access Journal
issn 2624-7402
language English
last_indexed 2024-03-10T12:52:04Z
publishDate 2021-03-01
publisher MDPI AG
record_format Article
series AgriEngineering
spelling doaj.art-3177697a02bd4a198b379fb070cfd4b32023-11-21T12:12:02ZengMDPI AGAgriEngineering2624-74022021-03-013215816710.3390/agriengineering3020010Rapid Truck Loading for Efficient Feedstock LogisticsRobert “Bobby” Grisso0John Cundiff1Subhash C. Sarin2Biological Systems Engineering, Virginia Tech, Blacksburg, VA 24061, USABiological Systems Engineering, Virginia Tech, Blacksburg, VA 24061, USAIndustrial and Systems Engineering, Virginia Tech, Blacksburg, VA 24061, USAA multi-bale handling unit offers an advantage for the efficient hauling of round bales. Two empty racks on trailers are left at a satellite storage location for loading while a truck tractor delivers two loaded racks to the biorefinery, thus uncoupling the loading and hauling operations and increasing the efficiency of both. The projected 10 min trailer exchange time equals the projected 10 min unload time at the biorefinery achieved by lifting off the two full racks and replacing them with two empties, a technology adapted from the container shipping industry. A concept is presented for a bale loader that latches onto the rack/trailer and loads bales into the bottom tier chambers. This machine will load 10 bales into the rack on the front trailer by attaching on to the front of the trailer and 10 bales into the rear trailer by attaching onto the rear. A telehandler removes bales from single-layer storage and places them in the bale loader to load the bottom tier compartments. The top tier compartments are loaded directly from the top. Expectations are that an experienced operator can average 9 loads in a 10 h workday, and load-out cost is estimated as 3.61 USD/Mg, assuming the average achieved load-out productivity over annual operation is 60% of optimum productivity (24 Mg/h) equal to 14.4 Mg/h. Cost increases to 4.81 USD/Mg when the productivity factor drops to 45%, and cost is 3.09 USD/Mg for a factor of 70%.https://www.mdpi.com/2624-7402/3/2/10biomassbiomass logisticshauling costsin-field haulinglocation allocationmanagement systems
spellingShingle Robert “Bobby” Grisso
John Cundiff
Subhash C. Sarin
Rapid Truck Loading for Efficient Feedstock Logistics
AgriEngineering
biomass
biomass logistics
hauling costs
in-field hauling
location allocation
management systems
title Rapid Truck Loading for Efficient Feedstock Logistics
title_full Rapid Truck Loading for Efficient Feedstock Logistics
title_fullStr Rapid Truck Loading for Efficient Feedstock Logistics
title_full_unstemmed Rapid Truck Loading for Efficient Feedstock Logistics
title_short Rapid Truck Loading for Efficient Feedstock Logistics
title_sort rapid truck loading for efficient feedstock logistics
topic biomass
biomass logistics
hauling costs
in-field hauling
location allocation
management systems
url https://www.mdpi.com/2624-7402/3/2/10
work_keys_str_mv AT robertbobbygrisso rapidtruckloadingforefficientfeedstocklogistics
AT johncundiff rapidtruckloadingforefficientfeedstocklogistics
AT subhashcsarin rapidtruckloadingforefficientfeedstocklogistics