Perencanaan Persediaan Suku Cadang (Spare Part) Mesin Tenun Sulzer Ruti Berdasarkan Analisis Keandalan
Availability of machine spare parts is very supporting f or maintenancea ctivity conducted in order to improve the machine performance. So far, PT. Eratex Djaja often have difficulty in ananging component stock particularly critical component of Sulzer Ruti machine, so it is necesiary to deie.-ine t...
Main Authors: | Teguh Baroto, Tutik Solikhati |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2010-04-01
|
Series: | Jurnal Teknik Industri |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/5 |
Similar Items
-
KEBIJAKAN PERSEDIAAN SUKU CADANG DI PT ABC MENGGUNAKAN METODE RCS (RELIABILITY CENTERED SPARES)
by: Fransiskus Tatas Dwi Atmaji, et al.
Published: (2018-12-01) -
FORECASTING PENGENDALIAN PERSEDIAAN SUKU CADANG MENGGUNAKAN METODE NAIVE
by: Syahrul Usman, et al.
Published: (2022-12-01) -
ANALISIS PENGENDALIAN PERSEDIAAN SUKU CADANG (SPAREPART) PADA BENGKEL PIAGGIO VESPA NUSA DUA
by: Ni Made Juli Adelia, et al.
Published: (2021-09-01) -
Pengendalian persediaan khusus suku cadang pada Pabrik Hot Strip Mill Krakatau Steel Cilegon
by: , HARTONO, Agus
Published: (1989) -
Analisis sistem persediaan suku-cadang head truck Volvo di PT. Terminal Peti Kemas Surabaya
by: , ADI, Kartiko, et al.
Published: (2002)