A Double-Level Calculation Model for the Construction Schedule Planning of Urban Rail Transit Network
The construction of urban rail transit (URT) guides and promotes urban development. Different URT line construction schedule, including construction sequence (priority order of line construction) and construction timing (when to build), will have different effects on urban traffic and development. T...
Main Authors: | Songsong Li, Qinghuai Liang, Kuo Han, Heng Wang, Jun Xu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-05-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/12/10/5268 |
Similar Items
-
Structural Renovation Design Study for Shanghai Rail Transit Line 3/4 Joint-rail Project at Baoshan Road Station
by: Tianrong SUN
Published: (2024-01-01) -
Improving Service Quality With the Fuzzy TOPSIS Method: A Case Study of the Beijing Rail Transit System
by: Jianmin Li, et al.
Published: (2019-01-01) -
Construction project management : planning and scheduling /
by: 176606 Naylor, Henry F. W.
Published: (1995) -
Research Focus at Different Stages of Urban Rail Transit Prophase Works in the New Era
by: Zichang LIU
Published: (2024-03-01) -
Comparative Analysis of Balanced Maintenance System and Scheduled Maintenance System for Urban Rail Transit Vehicle
by: Tao HUANG, et al.
Published: (2024-03-01)