A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs
This paper presents a methodology for building a consensus among the stakeholders based on the level of importance of each evaluation criterion to choose the best final design, approach, or solution for a project. The proposed methodology adopts an improved vague set minimum-cost consensus model (MC...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2018-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8240898/ |
_version_ | 1819304088986189824 |
---|---|
author | Pak Ki Kwok Henry Y. K. Lau |
author_facet | Pak Ki Kwok Henry Y. K. Lau |
author_sort | Pak Ki Kwok |
collection | DOAJ |
description | This paper presents a methodology for building a consensus among the stakeholders based on the level of importance of each evaluation criterion to choose the best final design, approach, or solution for a project. The proposed methodology adopts an improved vague set minimum-cost consensus model (MCCM) and a modified Delphi method. This paper discusses several shortcomings of the traditional MCCM and the Delphi method. It argues that humans' resistance to change based on a numerical rating scale follows a natural logarithm pattern instead of a linear or quadratic pattern as claimed in other studies. Hence, the traditional MCCM needs to be revised accordingly. In addition, an experiment was concluded to compare the proposed consensus-building methodology with the traditional Delphi method. The experiment showed that the proposed methodology is better than the traditional Delphi method regarding using fewer rounds to reach a consensus. At last, this paper applies the proposed methodology to the field of road junction design selection. |
first_indexed | 2024-12-24T06:59:43Z |
format | Article |
id | doaj.art-32a62f53bbce4bfabb0df3ff37a00189 |
institution | Directory Open Access Journal |
issn | 2169-3536 |
language | English |
last_indexed | 2024-12-24T06:59:43Z |
publishDate | 2018-01-01 |
publisher | IEEE |
record_format | Article |
series | IEEE Access |
spelling | doaj.art-32a62f53bbce4bfabb0df3ff37a001892022-12-21T17:09:38ZengIEEEIEEE Access2169-35362018-01-0163509352310.1109/ACCESS.2017.27876778240898A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum CostsPak Ki Kwok0https://orcid.org/0000-0002-7961-8326Henry Y. K. Lau1Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong, Hong KongDepartment of Industrial and Manufacturing Systems Engineering, The University of Hong Kong, Hong KongThis paper presents a methodology for building a consensus among the stakeholders based on the level of importance of each evaluation criterion to choose the best final design, approach, or solution for a project. The proposed methodology adopts an improved vague set minimum-cost consensus model (MCCM) and a modified Delphi method. This paper discusses several shortcomings of the traditional MCCM and the Delphi method. It argues that humans' resistance to change based on a numerical rating scale follows a natural logarithm pattern instead of a linear or quadratic pattern as claimed in other studies. Hence, the traditional MCCM needs to be revised accordingly. In addition, an experiment was concluded to compare the proposed consensus-building methodology with the traditional Delphi method. The experiment showed that the proposed methodology is better than the traditional Delphi method regarding using fewer rounds to reach a consensus. At last, this paper applies the proposed methodology to the field of road junction design selection.https://ieeexplore.ieee.org/document/8240898/Group decision-makingminimum cost consensus modelDelphi methodvague set theoryproject management |
spellingShingle | Pak Ki Kwok Henry Y. K. Lau A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs IEEE Access Group decision-making minimum cost consensus model Delphi method vague set theory project management |
title | A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs |
title_full | A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs |
title_fullStr | A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs |
title_full_unstemmed | A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs |
title_short | A Modified Consensus-Building Methodology for Reaching a Group Decision Using Minimum Costs |
title_sort | modified consensus building methodology for reaching a group decision using minimum costs |
topic | Group decision-making minimum cost consensus model Delphi method vague set theory project management |
url | https://ieeexplore.ieee.org/document/8240898/ |
work_keys_str_mv | AT pakkikwok amodifiedconsensusbuildingmethodologyforreachingagroupdecisionusingminimumcosts AT henryyklau amodifiedconsensusbuildingmethodologyforreachingagroupdecisionusingminimumcosts AT pakkikwok modifiedconsensusbuildingmethodologyforreachingagroupdecisionusingminimumcosts AT henryyklau modifiedconsensusbuildingmethodologyforreachingagroupdecisionusingminimumcosts |