Transient numerical analysis of charging a heat accumulator in a combined heat and power plant
This paper presents a technical description and characteristics of heat accumulation system operation in one of the Polish combined heat and power (CHP) plants. The total thermal capacity of the nonpressure hot water accumulator is 75 MWh. An important issue in the case of hot water tanks is thermal...
Main Authors: | Dzierwa Piotr, Taler Jan, Peret Patryk, Taler Dawid, Trojan Marcin |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/99/e3sconf_mpsu2021_00009.pdf |
Similar Items
-
Analysis of the Causes of the Emergency Shutdown of Natural Gas-Fired Water Peak Boilers at the Large Municipal Combined Heat and Power Plant
by: Marcin Trojan, et al.
Published: (2023-08-01) -
The use of a solution of the inverse heat conduction problem to monitor thermal stresses
by: Taler Jan, et al.
Published: (2019-01-01) -
New method for determining the optimum fluid temperature when heating pressure thick-walled components with openings
by: Taler Dawid, et al.
Published: (2019-01-01) -
Shortening start-up and an extension of the power unit load range
by: Taler Jan, et al.
Published: (2017-01-01) -
Cooling Modelling of an Electrically Heated Ceramic Heat Accumulator
by: Dawid Taler, et al.
Published: (2022-08-01)