Estimation method of earthwork excavation using shield tunneling data -- a case study of Chengdu Metro
The occurrence of over-excavation or under-excavation in tunnel construction poses significant safety risks. Moreover, there is currently no automatic estimation method available for real-time estimation of earthwork excavation, particularly in the case of shield tunnels. In this study, we tracked t...
Main Authors: | Yuxin Cao, Haohan Xiao, Maozhou He, Liao Fan, Quanbin Xu |
---|---|
Format: | Article |
Language: | English |
Published: |
Frontiers Media S.A.
2023-12-01
|
Series: | Frontiers in Earth Science |
Subjects: | |
Online Access: | https://www.frontiersin.org/articles/10.3389/feart.2023.1295672/full |
Similar Items
-
Proceedings of Rapid Excavation and Tunelling /
by: Rapid Excavation and Tunneling Conference, 3rd., Las Vegas, Nevada, June 14-17, 1976, et al.
Published: (1976) -
Numerical Simulation of a Deep Excavation near a Shield Tunnel
by: Qian Sun, et al.
Published: (2018-01-01) -
Excavations [kasetvideo]
Published: ([19-) -
Excavations [filem]
Published: ([19-) -
Trench excavation and support/
by: 207246 Budleigh, J. K.
Published: (1989)