Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports

Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these...

Olles dieđut

Bibliográfalaš dieđut
Váldodahkkit: Jose Antonio Lozano-Galant, Ignacio Payá-Zaforteza, Jose Turmo
Materiálatiipa: Artihkal
Giella:English
Almmustuhtton: Riga Technical University Press 2015-09-01
Ráidu:The Baltic Journal of Road and Bridge Engineering
Fáttát:
Liŋkkat:https://bjrbe-journals.rtu.lv/article/view/3446