Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these...
Main Authors: | Jose Antonio Lozano-Galant, Ignacio Payá-Zaforteza, Jose Turmo |
---|---|
Format: | Article |
Language: | English |
Published: |
RTU Press
2015-09-01
|
Series: | The Baltic Journal of Road and Bridge Engineering |
Subjects: | |
Online Access: | https://bjrbe-journals.rtu.lv/article/view/3446 |
Similar Items
-
Cable stayed bridges /
by: Walther, Rene
Published: (c198) -
Cable stayed bridges /
by: Walther, Rene
Published: (1999) -
Cable stayed bridge construction : case study of Sungai Johor cable stayed bridge /
by: Lee, Foo Wei, 1985-, et al.
Published: (2009) -
Cable stayed bridge construction [electronic resource] : case study of Sungai Johor cable stayed bridge /
by: Lee, Foo Wei, 1985-, et al.
Published: (2009) -
Construction and design of cable-stayed bridges/
by: 271059 Padolny, Walter, et al.
Published: (1976)