Risk assessment of mobile crane overturning in Asymmetric Tandem Lifting (ATL) operation based on fuzzy fault tree analysis (FFTA)
Lifting operation, especially Asymmetric Tandem Lift, is one of the essential activities in the construction industry, posing a substantial threat to sustainable management. This study aims to assess the risk of crane overturning in ATL using the fuzzy fault tree analysis method. The risk factors af...
Main Authors: | Vahid Kargar, Mehdi Jahangiri, Moslem Alimohammadlu, Mojtaba Kamalinia, Marziyeh Mirazahossieninejad |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2022-12-01
|
Series: | Results in Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S259012302200425X |
Similar Items
-
Risk Assessment of Lift-Jacking Accidents Using FFTA-FMEA
by: Na Xu, et al.
Published: (2023-06-01) -
Stability Assessment as a Criterion of Stabilization of the Movement Trajectory of Mobile Crane Working Elements
by: W. Kacalak, et al.
Published: (2018-02-01) -
Multivariate calculation of the lifting mechanism of a bridge-type crane on a computer
by: Vitchuk P.V.
Published: (2023-03-01) -
Study on Overturn Proof Monitoring System of Mobile Crane
by: Bok-Joong Yoon, et al.
Published: (2021-07-01) -
Crane-powered pectus excavatum repair: the NeoPectus surgery
by: Hyung Joo Park, et al.
Published: (2023-12-01)