Availability Projections of Hydroelectric Power Plants through Monte Carlo Simulation
The present work proposes a Monte Carlo Simulation (MCS) to obtain availability projections for Hydroelectric Power Plants (HPP), based mainly on regulatory aspects involving the Availability Factor (AFA). The main purpose of the simulation is to generate scenarios to obtain statistics for risk anal...
Main Authors: | Marcos Tadeu Barros de Oliveira, Patrícia de Sousa Oliveira Silva, Elisa Oliveira, André Luís Marques Marcato, Giovani Santiago Junqueira |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-12-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/24/8398 |
Similar Items
-
Maintenance Schedule Optimization Applied to Large Hydroelectric Plants: Towards a Methodology Encompassing Regulatory Aspects
by: Patricia de Sousa Oliveira, et al.
Published: (2021-01-01) -
“Shutdown”, “Reconducción” Herramientas presupuestarias de los Estados Unidos de América y la República Argentina
by: Mónica Bariggi
Published: (2019-12-01) -
Performance evaluation of a 2 MW wind power project
by: V P Khambalkar, et al.
Published: (2017-10-01) -
Deindustrialization : restructuring the economy /
by: Summers, Gene F.
Published: (1984) -
The Politics of Internet Shutdowns
by: Nikhil Mulani
Published: (2022-12-01)