Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)

Pembangkit Listrik Tenaga Uap (PLTU) PT Indo Pusaka Berau is a PLN work unit that provides electricity to consumers. The problem of the company is the frequent damage to boiler engine components. The company uses corrective maintenance system. On the problem, it is necessary to develop a machine mai...

Full description

Bibliographic Details
Main Authors: Hamim Rachman, Annisa Kesy Garside, Heri Mujayin Kholik
Format: Article
Language:English
Published: Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang 2017-08-01
Series:Jurnal Teknik Industri
Subjects:
Online Access:http://ejournal.umm.ac.id/index.php/industri/article/view/4614
_version_ 1811249727539249152
author Hamim Rachman
Annisa Kesy Garside
Heri Mujayin Kholik
author_facet Hamim Rachman
Annisa Kesy Garside
Heri Mujayin Kholik
author_sort Hamim Rachman
collection DOAJ
description Pembangkit Listrik Tenaga Uap (PLTU) PT Indo Pusaka Berau is a PLN work unit that provides electricity to consumers. The problem of the company is the frequent damage to boiler engine components. The company uses corrective maintenance system. On the problem, it is necessary to develop a machine maintenance system with Reliability Centered Maintenance (RCM) approach. The objective of the study was to select a boiler system maintenance action based on the RCM method and component replacement interval to minimize Total Minimum Downtime (TMD). Results of data processing RCM method, component in category Condition Directed (CD) is El Bow component. Components in Time Directed category (TD) are gland seal steam and check valve. Components in the Time Directed category are calculated for component replacement intervals on TMD criteria. The calculation result from component replacement interval was obtained 37 days for gland seal steam component and 58 days for check valve component. The proposed treatment of RCM method can reduce downtime by 11.33% of the company's maintenance methods.
first_indexed 2024-04-12T15:51:32Z
format Article
id doaj.art-375284ed4d6d4928b04b88af2d59acc1
institution Directory Open Access Journal
issn 1978-1431
2527-4112
language English
last_indexed 2024-04-12T15:51:32Z
publishDate 2017-08-01
publisher Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
record_format Article
series Jurnal Teknik Industri
spelling doaj.art-375284ed4d6d4928b04b88af2d59acc12022-12-22T03:26:29ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122017-08-01181869310.22219/JTIUMM.Vol18.No1.86-933890Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)Hamim RachmanAnnisa Kesy GarsideHeri Mujayin KholikPembangkit Listrik Tenaga Uap (PLTU) PT Indo Pusaka Berau is a PLN work unit that provides electricity to consumers. The problem of the company is the frequent damage to boiler engine components. The company uses corrective maintenance system. On the problem, it is necessary to develop a machine maintenance system with Reliability Centered Maintenance (RCM) approach. The objective of the study was to select a boiler system maintenance action based on the RCM method and component replacement interval to minimize Total Minimum Downtime (TMD). Results of data processing RCM method, component in category Condition Directed (CD) is El Bow component. Components in Time Directed category (TD) are gland seal steam and check valve. Components in the Time Directed category are calculated for component replacement intervals on TMD criteria. The calculation result from component replacement interval was obtained 37 days for gland seal steam component and 58 days for check valve component. The proposed treatment of RCM method can reduce downtime by 11.33% of the company's maintenance methods.http://ejournal.umm.ac.id/index.php/industri/article/view/4614Corrective Maintenance, Downtime, RCM, Boiler, and TMD.
spellingShingle Hamim Rachman
Annisa Kesy Garside
Heri Mujayin Kholik
Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
Jurnal Teknik Industri
Corrective Maintenance, Downtime, RCM, Boiler, and TMD.
title Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
title_full Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
title_fullStr Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
title_full_unstemmed Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
title_short Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM)
title_sort usulan perawatan sistem boiler dengan metode reliability centered maintenance rcm
topic Corrective Maintenance, Downtime, RCM, Boiler, and TMD.
url http://ejournal.umm.ac.id/index.php/industri/article/view/4614
work_keys_str_mv AT hamimrachman usulanperawatansistemboilerdenganmetodereliabilitycenteredmaintenancercm
AT annisakesygarside usulanperawatansistemboilerdenganmetodereliabilitycenteredmaintenancercm
AT herimujayinkholik usulanperawatansistemboilerdenganmetodereliabilitycenteredmaintenancercm