Study the delays and conflicts for construction projects and their mutual relationship: A review
Delays and conflicts (D&Cs) are adversely affecting the performance of construction projects. They have separately been addressed by many authors but the mutual relationship among them is still a key grey area. Therefore, this study aims to explore this hidden relationship. Literature was review...
Main Authors: | Junaid Tariq, S. Shujaa Safdar Gardezi |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2023-02-01
|
Series: | Ain Shams Engineering Journal |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2090447922001265 |
Similar Items
-
Centralidade basada em deslocamentos e seus reflexos sobre a estrutura monopolicentrica da região metropolitana do Rio de Janeiro
by: José André Villas Bôas Mello, et al.
Published: (2016-01-01) -
Analysis of delay factors and their effects on construction projects
by: Yahya Rashid
Published: (2019-12-01) -
A Review on Significant Factors Causing Delays in Saudi Arabia Construction Projects
by: Abdulali Mohammed Alajmi, et al.
Published: (2022-10-01) -
Awareness of the mutual rights of parent - child view of Islamic teachings on reduce conflicts between parent - child
by: Tahereh jabbari, et al.
Published: (2014-09-01) -
Delay Causes and Types in Nigerian Power Construction Projects
by: Usman Ismaila, et al.
Published: (2022-01-01)