Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard

A new layout of the U-shaped automated terminal is more convenient to connect between the terminal and the railway. In this study, a sort of cluster scheduling method for multiple equipment between a U-shaped automated terminal yard and a railway yard is proposed. The innovation points are as follow...

Full description

Bibliographic Details
Main Authors: Junjun Li, Lixing Yan, Bowei Xu
Format: Article
Language:English
Published: MDPI AG 2023-02-01
Series:Journal of Marine Science and Engineering
Subjects:
Online Access:https://www.mdpi.com/2077-1312/11/2/417
_version_ 1797620024536465408
author Junjun Li
Lixing Yan
Bowei Xu
author_facet Junjun Li
Lixing Yan
Bowei Xu
author_sort Junjun Li
collection DOAJ
description A new layout of the U-shaped automated terminal is more convenient to connect between the terminal and the railway. In this study, a sort of cluster scheduling method for multiple equipment between a U-shaped automated terminal yard and a railway yard is proposed. The innovation points are as follows: (1) Considering that the rail gantry crane (RGC), intelligent guided vehicle (IGV), and double cantilever rail crane (DCRC) usually work in groups, they are grouped and cluster-scheduled. (2) A hybrid integer programming model is established to minimize container transit times, and non-crossing constraints and safe distance constraints are included to reflect complex interactions among terminal equipment. (3) An ADMM (Alternating Direction Method of Multipliers)-based framework is proposed to dualize the hard-edge constraints and break the cluster scheduling problem down into a specific subproblem set of RGCs, IGVs, and DCRCs, and their time cost is iteratively adjusted to improve the solution quality. The experiment results show that the solution of the proposed method, which can effectively avoid IGV conflict, is better than that of the standard Lagrange relaxation (LR) when the number of equipments participating in scheduling increases. This study on multi-equipment cluster scheduling is conducive to improving the collaborative handling and continuous work of terminal equipment, and improving the efficiency of the automated terminal and the sea–rail intermodal transport.
first_indexed 2024-03-11T08:35:31Z
format Article
id doaj.art-3932b614625846328ebc8539185e6907
institution Directory Open Access Journal
issn 2077-1312
language English
last_indexed 2024-03-11T08:35:31Z
publishDate 2023-02-01
publisher MDPI AG
record_format Article
series Journal of Marine Science and Engineering
spelling doaj.art-3932b614625846328ebc8539185e69072023-11-16T21:28:52ZengMDPI AGJournal of Marine Science and Engineering2077-13122023-02-0111241710.3390/jmse11020417Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway YardJunjun Li0Lixing Yan1Bowei Xu2Merchant Marine College, Shanghai Maritime University, Shanghai 201306, ChinaInstitute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, ChinaInstitute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, ChinaA new layout of the U-shaped automated terminal is more convenient to connect between the terminal and the railway. In this study, a sort of cluster scheduling method for multiple equipment between a U-shaped automated terminal yard and a railway yard is proposed. The innovation points are as follows: (1) Considering that the rail gantry crane (RGC), intelligent guided vehicle (IGV), and double cantilever rail crane (DCRC) usually work in groups, they are grouped and cluster-scheduled. (2) A hybrid integer programming model is established to minimize container transit times, and non-crossing constraints and safe distance constraints are included to reflect complex interactions among terminal equipment. (3) An ADMM (Alternating Direction Method of Multipliers)-based framework is proposed to dualize the hard-edge constraints and break the cluster scheduling problem down into a specific subproblem set of RGCs, IGVs, and DCRCs, and their time cost is iteratively adjusted to improve the solution quality. The experiment results show that the solution of the proposed method, which can effectively avoid IGV conflict, is better than that of the standard Lagrange relaxation (LR) when the number of equipments participating in scheduling increases. This study on multi-equipment cluster scheduling is conducive to improving the collaborative handling and continuous work of terminal equipment, and improving the efficiency of the automated terminal and the sea–rail intermodal transport.https://www.mdpi.com/2077-1312/11/2/417U-shaped automated terminal yardcluster schedulingADMM
spellingShingle Junjun Li
Lixing Yan
Bowei Xu
Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
Journal of Marine Science and Engineering
U-shaped automated terminal yard
cluster scheduling
ADMM
title Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
title_full Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
title_fullStr Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
title_full_unstemmed Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
title_short Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
title_sort research on multi equipment cluster scheduling of u shaped automated terminal yard and railway yard
topic U-shaped automated terminal yard
cluster scheduling
ADMM
url https://www.mdpi.com/2077-1312/11/2/417
work_keys_str_mv AT junjunli researchonmultiequipmentclusterschedulingofushapedautomatedterminalyardandrailwayyard
AT lixingyan researchonmultiequipmentclusterschedulingofushapedautomatedterminalyardandrailwayyard
AT boweixu researchonmultiequipmentclusterschedulingofushapedautomatedterminalyardandrailwayyard