Research on Multi-Equipment Cluster Scheduling of U-Shaped Automated Terminal Yard and Railway Yard
A new layout of the U-shaped automated terminal is more convenient to connect between the terminal and the railway. In this study, a sort of cluster scheduling method for multiple equipment between a U-shaped automated terminal yard and a railway yard is proposed. The innovation points are as follow...
Main Authors: | Junjun Li, Lixing Yan, Bowei Xu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-02-01
|
Series: | Journal of Marine Science and Engineering |
Subjects: | |
Online Access: | https://www.mdpi.com/2077-1312/11/2/417 |
Similar Items
-
Yard Crane Scheduling to Minimize Total Weighted Vessel Loading Time in Container Terminals
by: Huang, Shell Ying, et al.
Published: (2017) -
Investigating transportation system in container terminals and developing a yard crane scheduling model
by: Hassan Javanshir, et al.
Published: (2012-01-01) -
Design of digital twin applications in automated storage yard scheduling
by: Gao, Yinping, et al.
Published: (2022) -
Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
by: Doaa Naeem, et al.
Published: (2022-12-01) -
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
by: Hsien-Pin Hsu, et al.
Published: (2021-09-01)