Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Baghdad
2021-02-01
|
Series: | Journal of Engineering |
Subjects: | |
Online Access: | https://joe.uobaghdad.edu.iq/index.php/main/article/view/1297 |
_version_ | 1827851835580350464 |
---|---|
author | Karukh Hassan Mohammad Noori Sadiq Ali Basira Majeed Najm |
author_facet | Karukh Hassan Mohammad Noori Sadiq Ali Basira Majeed Najm |
author_sort | Karukh Hassan Mohammad |
collection | DOAJ |
description | Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine whether the overrun of project cost and schedule significantly varied depending on project type, size, duration, location, and awarded years. The findings indicated that cost overruns are very common due to variation orders. 95.6% of the projects were studied being impacted, and overrun in project cost are also huge, with 16%. Time also overruns more common than cost overruns due to the variation orders. 98.7% of the projects were studied in Sulaimani were affected by time overrun with an average of 46.3% of initial duration observed. Findings also indicated that two out of five parameters measured in the analysis had a significant correlation with project cost overruns. Three out of five considered variables correlated with construction time overruns. |
first_indexed | 2024-03-12T10:39:27Z |
format | Article |
id | doaj.art-398804bca33847488ae322c5aa739762 |
institution | Directory Open Access Journal |
issn | 1726-4073 2520-3339 |
language | English |
last_indexed | 2024-03-12T10:39:27Z |
publishDate | 2021-02-01 |
publisher | University of Baghdad |
record_format | Article |
series | Journal of Engineering |
spelling | doaj.art-398804bca33847488ae322c5aa7397622023-09-02T08:17:05ZengUniversity of BaghdadJournal of Engineering1726-40732520-33392021-02-0127210.31026/j.eng.2021.02.08Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani GovernorateKarukh Hassan Mohammad0Noori Sadiq Ali1Basira Majeed Najm2College of Engineering-University of Sulaimani, Sulaimani, IraqCollege of Engineering- University of Cihan- Erbil - IraqCollege of Administration and Economic - Kurdistan Region- IraqVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine whether the overrun of project cost and schedule significantly varied depending on project type, size, duration, location, and awarded years. The findings indicated that cost overruns are very common due to variation orders. 95.6% of the projects were studied being impacted, and overrun in project cost are also huge, with 16%. Time also overruns more common than cost overruns due to the variation orders. 98.7% of the projects were studied in Sulaimani were affected by time overrun with an average of 46.3% of initial duration observed. Findings also indicated that two out of five parameters measured in the analysis had a significant correlation with project cost overruns. Three out of five considered variables correlated with construction time overruns.https://joe.uobaghdad.edu.iq/index.php/main/article/view/1297Construction projects, Cost overrun, Time overrun, Variation orders |
spellingShingle | Karukh Hassan Mohammad Noori Sadiq Ali Basira Majeed Najm Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate Journal of Engineering Construction projects, Cost overrun, Time overrun, Variation orders |
title | Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate |
title_full | Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate |
title_fullStr | Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate |
title_full_unstemmed | Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate |
title_short | Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate |
title_sort | assessment of the cost and time impact of variation orders on construction projects in sulaimani governorate |
topic | Construction projects, Cost overrun, Time overrun, Variation orders |
url | https://joe.uobaghdad.edu.iq/index.php/main/article/view/1297 |
work_keys_str_mv | AT karukhhassanmohammad assessmentofthecostandtimeimpactofvariationordersonconstructionprojectsinsulaimanigovernorate AT noorisadiqali assessmentofthecostandtimeimpactofvariationordersonconstructionprojectsinsulaimanigovernorate AT basiramajeednajm assessmentofthecostandtimeimpactofvariationordersonconstructionprojectsinsulaimanigovernorate |