Study on the technology of grouting and reinforcing the foundation of a railway bridge above shallow old mine goaf
The city fast track railway bridge studied in this paper is located above an old mined out area. There is a 1500m2 underground goaf in the construction site with a depth of 30.8~53.2m, the seam thickness is 2.0~2.5m and the dip angle is 50~63 degrees. Although the mine has been abandoned for many ye...
Main Authors: | Sui Hui-Quan, Bait Chun-Yuan |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201816901041 |
Similar Items
-
Experimental Research on Application of Waste Concrete Powder–Waste Brick Powder–Cement Grout for Foundation Reinforcement in Mining Goaf
by: Yan Wang, et al.
Published: (2023-09-01) -
Numerical modelling of compensation grouting above shallow tunnels
by: Wisser, C, et al.
Published: (2005) -
Time Series Effect on Surface Deformation above Goaf Area with Multiple-Seam Mining
by: Zhenyue Shi, et al.
Published: (2020-08-01) -
Numerical analysis of bridge foundation behaviour on the old railway line
by: Ludmila Aleksandrovna Strokova, et al.
Published: (2017-08-01) -
Numerical analysis of bridge foundation behaviour on the old railway line
by: Ludmila Aleksandrovna Strokova, et al.
Published: (2017-08-01)