-Planning Multi-Stage Rework Production System Considering Energy Consumption

Today, in order to maximize the productivity, sales and profits of factories, variousfactors must be considered. One of these factors is energy saving, which leads tosuccess in any businesses. Another important factor is rework in the productionprocess, which reduces waste and optimal use of resourc...

Full description

Bibliographic Details
Main Authors: Hadi Mokhtari, Hossein Shirani
Format: Article
Language:fas
Published: Allameh Tabataba'i University Press 2021-09-01
Series:Muṭāli̒āt-i Mudīriyyat-i Ṣan̒atī
Subjects:
Online Access:https://jims.atu.ac.ir/article_13161_8bbe0705d80658aaac74eb203384af97.pdf
Description
Summary:Today, in order to maximize the productivity, sales and profits of factories, variousfactors must be considered. One of these factors is energy saving, which leads tosuccess in any businesses. Another important factor is rework in the productionprocess, which reduces waste and optimal use of resources. In this research, a linearmathematical programming model has been developed for a multi-stage productionsystem considering energy consumption and the possibility of rework. The objectivefunction of the model is calculated from a combination of energy costs and rawmaterial costs, and the proposed model has three categories of balance constraints,demand constraints and time constraints. The balance constraints, the task ofcalculating the number of raw materials required and the amount of input materialsto each part of the production stage, the demand constraints are the task ofcalculating the number of final products, and the inventory and time constraints arealso the task of calculating the time available to the production of each product.A hypothetical production system is flow shop. To understand the proposed modelbetter, a logical example is designed and solved and analyzed using GAMS software. In the current situation , energy consumption is one of the concerns of policy makers in the fields of production and industry , and therefore this research with the proposed model , helps decision makers in manufacturing industries to ensure optimal energy consumption , optimal decisions in adopt multi -stage rework and production condition
ISSN:2251-8029
2476-602X