To Selection of Small-Capacity Turbine Type and Rated Conditions
Profitability of industrial-heating boiler transition to mini-TPP is revealed in the paper. The paper presents a comparative analysis of high- and low-speed turbines of small capacity.
Main Authors: | N. B. Karnitsky, N. V. Panteley |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2010-08-01
|
Series: | Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika |
Online Access: | https://energy.bntu.by/jour/article/view/323 |
Similar Items
-
Basic Principles for Elaboration of Technical Requirements to Control and Protective TRB Turbine Systems
by: N. V. Panteley
Published: (2007-08-01) -
Technical and Economic Advantages of Turbo-Drive Variant with TRB Turbines over Turbo-Generator Variant in Low Power Engineering
by: N. V. Panteley
Published: (2008-04-01) -
COMBINED CYCLE GAS TURBINE FOR THERMAL POWER STATIONS: EXPERIENCE IN DESIGNING AND OPERATION, PROSPECTS IN APPLICATION
by: N. B. Karnitsky, et al.
Published: (2014-06-01) -
DETERMINATION OF PHYSICAL PARAMETERS OF DEPOSITS ON BOILER HEATING SURFACES USING METHODS OF MATHEMATICAL MODELING UNDER CONDITIONS OF LIMITED INFORMATION
by: N. B. Karnitsky, et al.
Published: (2010-02-01) -
Analysis of Technical State of Thermal and Mechanical Equipment of Thermal Power Stations in the Republic of Belarus under Conditions of Investment Deficit
by: S. N. Shichko, et al.
Published: (2004-08-01)