Analysis of Flood Water Level Variation in the Yichang–Chenglingji Reach of the Yangtze River after Three Gorges Project Operation
Since the impoundment of the Three Gorges Project, the downstream hydrology and river dynamics have been modified. The Yichang–Chenglingji Reach (YCR), as a part of the mainstream of the Middle Yangtze River, has consequently been significantly scoured, which has resulted in stream trenching and sec...
Main Authors: | Lei Jiang, Ziyue Zeng |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-03-01
|
Series: | Water |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-4441/16/6/841 |
Similar Items
-
Waterway Channel Stability and Management Measures of Chenglingji—Wuhan Reaches in the Middle Section of the Yangtze River
by: Xiabo Zhang, et al.
Published: (2023-05-01) -
Operating Effects of the Three Gorges Reservoir on the Riverbed Stability in the Wuhan Reach of the Yangtze River
by: Zhi Yin, et al.
Published: (2021-11-01) -
Optimized flood control for the Three Gorges Reservoir considering evolving flood propagation trends in the Jingjiang Reach of the Yangtze River
by: Lan Lan, et al.
Published: (2022-09-01) -
Living in a Chinese Industrial New Town: A Case Study of Chenglingji New Port Area
by: Yao Shen, et al.
Published: (2023-03-01) -
Evaluation and Prediction of Landslide Susceptibility in Yichang Section of Yangtze River Basin Based on Integrated Deep Learning Algorithm
by: Lili Chang, et al.
Published: (2022-06-01)