Engine Room Module Installation System Risk Analysis Based on Bayesian Network

Implementation of system installation risk on engine room module aims to anticipate ship production delays. However, in its implementation, there is the problem of ship delivery delays in various shipbuilding companies. This research will analyze the risk analysis of the installation of the engin...

Full description

Bibliographic Details
Main Authors: Intan Baroroh, Buana Ma’ruf, Minto Basuki, Didik Hardianto, Tri Agung Kristiyono
Format: Article
Language:English
Published: Universitas Indonesia 2024-01-01
Series:International Journal of Technology
Subjects:
Online Access:https://ijtech.eng.ui.ac.id/article/view/5136
_version_ 1797347138366078976
author Intan Baroroh
Buana Ma’ruf
Minto Basuki
Didik Hardianto
Tri Agung Kristiyono
author_facet Intan Baroroh
Buana Ma’ruf
Minto Basuki
Didik Hardianto
Tri Agung Kristiyono
author_sort Intan Baroroh
collection DOAJ
description Implementation of system installation risk on engine room module aims to anticipate ship production delays. However, in its implementation, there is the problem of ship delivery delays in various shipbuilding companies. This research will analyze the risk analysis of the installation of the engine room module system by identifying risk factors and parameters that affect performance as a hazard identification that has the potential to cause delivery delays. The object of the research is the Indonesian Navy's Auxiliary Hospital Ship, which has 6 zones with a pilot project developed in zone 2. This includes an engine room that contains important constructions in the form of a main motor foundation, auxiliary motor, and other machinery, where the system was integrated. Moreover, there are some works consisting of construction, outfitting, and commissioning which are very complicated and require high accuracy. The aim of the implementation of risk analysis of the installation system in the engine room’s module is to assess potential risks, the effect of risk on project delays, and project cost overruns. The research method uses a Bayesian network because it is able to assess the most potential risks and predict the possibility of delays at network nodes. The primary risk is associated with electrical activities, specifically electrical outfitting on wiring, clamping, and compound sub-components with a probability of (0.0002560) in the Machinery Outfitting and Electrical Department. This risk stems from inappropriate steps during drawing revisions, which have the potential to cause delays in equipment installation, cable material procurement, and the generation of cable cutting data. Therefore, early coordination with production planning control, design, and the supply chain is crucial.
first_indexed 2024-03-08T11:43:20Z
format Article
id doaj.art-3abc198c83d24b8ca1c023cc1795b4ec
institution Directory Open Access Journal
issn 2086-9614
2087-2100
language English
last_indexed 2024-03-08T11:43:20Z
publishDate 2024-01-01
publisher Universitas Indonesia
record_format Article
series International Journal of Technology
spelling doaj.art-3abc198c83d24b8ca1c023cc1795b4ec2024-01-25T01:56:09ZengUniversitas IndonesiaInternational Journal of Technology2086-96142087-21002024-01-01151758610.14716/ijtech.v15i1.51365136Engine Room Module Installation System Risk Analysis Based on Bayesian NetworkIntan Baroroh0Buana Ma’ruf1Minto Basuki2Didik Hardianto3Tri Agung Kristiyono4Department of Naval Architecture and Ship Building, Marine Science and Technology, Hang Tuah University (UHT), Jalan Arief Rahman Hakim 150 Surabaya, East Java 60111, IndonesiaThe National Research and Innovation Agency (BRIN), Jalan Hidro Dinamika, Keputih, Sukolilo, Surabaya. East Java 60111, IndonesiaDepartment of Marine Engineering Institut Teknologi Adhi Tama Surabaya (ITATS), Jalan Arief Rahman Hakim 100 Surabaya, East Java 60117, IndonesiaDepartment of Naval Architecture and Ship Building, Marine Science and Technology, Hang Tuah University (UHT), Jalan Arief Rahman Hakim 150 Surabaya, East Java 60111, IndonesiaDepartment of Naval Architecture and Ship Building, Marine Science and Technology, Hang Tuah University (UHT), Jalan Arief Rahman Hakim 150 Surabaya, East Java 60111, IndonesiaImplementation of system installation risk on engine room module aims to anticipate ship production delays. However, in its implementation, there is the problem of ship delivery delays in various shipbuilding companies. This research will analyze the risk analysis of the installation of the engine room module system by identifying risk factors and parameters that affect performance as a hazard identification that has the potential to cause delivery delays. The object of the research is the Indonesian Navy's Auxiliary Hospital Ship, which has 6 zones with a pilot project developed in zone 2. This includes an engine room that contains important constructions in the form of a main motor foundation, auxiliary motor, and other machinery, where the system was integrated. Moreover, there are some works consisting of construction, outfitting, and commissioning which are very complicated and require high accuracy. The aim of the implementation of risk analysis of the installation system in the engine room’s module is to assess potential risks, the effect of risk on project delays, and project cost overruns. The research method uses a Bayesian network because it is able to assess the most potential risks and predict the possibility of delays at network nodes. The primary risk is associated with electrical activities, specifically electrical outfitting on wiring, clamping, and compound sub-components with a probability of (0.0002560) in the Machinery Outfitting and Electrical Department. This risk stems from inappropriate steps during drawing revisions, which have the potential to cause delays in equipment installation, cable material procurement, and the generation of cable cutting data. Therefore, early coordination with production planning control, design, and the supply chain is crucial.https://ijtech.eng.ui.ac.id/article/view/5136bayesian networkinstallation engine room modulerisk analysis
spellingShingle Intan Baroroh
Buana Ma’ruf
Minto Basuki
Didik Hardianto
Tri Agung Kristiyono
Engine Room Module Installation System Risk Analysis Based on Bayesian Network
International Journal of Technology
bayesian network
installation engine room module
risk analysis
title Engine Room Module Installation System Risk Analysis Based on Bayesian Network
title_full Engine Room Module Installation System Risk Analysis Based on Bayesian Network
title_fullStr Engine Room Module Installation System Risk Analysis Based on Bayesian Network
title_full_unstemmed Engine Room Module Installation System Risk Analysis Based on Bayesian Network
title_short Engine Room Module Installation System Risk Analysis Based on Bayesian Network
title_sort engine room module installation system risk analysis based on bayesian network
topic bayesian network
installation engine room module
risk analysis
url https://ijtech.eng.ui.ac.id/article/view/5136
work_keys_str_mv AT intanbaroroh engineroommoduleinstallationsystemriskanalysisbasedonbayesiannetwork
AT buanamaruf engineroommoduleinstallationsystemriskanalysisbasedonbayesiannetwork
AT mintobasuki engineroommoduleinstallationsystemriskanalysisbasedonbayesiannetwork
AT didikhardianto engineroommoduleinstallationsystemriskanalysisbasedonbayesiannetwork
AT triagungkristiyono engineroommoduleinstallationsystemriskanalysisbasedonbayesiannetwork