Development of a maintenance schedule plan to improve the equipment efficiency of an industry: a case study
The aim of this study is to implement Total Productive Maintenance (TPM) in a continuous injection molding industry. By implementing TPM, the industry can increase their Overall Equipment Effectiveness (OEE) and productivity. Before implementing TPM, overall equipment efficiency, availability rate,...
Main Authors: | A. Shams, Md. F. Rabby, Md. N. Istiak |
---|---|
Format: | Article |
Language: | English |
Published: |
Ayandegan Institute of Higher Education,
2019-06-01
|
Series: | International Journal of Research in Industrial Engineering |
Subjects: | |
Online Access: | http://www.riejournal.com/article_90977_9abd75ef05870775a1ccc065489a48d9.pdf |
Similar Items
-
Selecting the best tools and framework to evaluate equipment malfunctions and improve the OEE in the cork industry
by: Paulo Marinho, et al.
Published: (2021-12-01) -
Defect reduction in a capacitor manufacturing process through Six Sigma concept: A case study
by: Ravi Shankar Raman, et al.
Published: (2019-02-01) -
Quality Control Analysis Using Flowchart, Check Sheet, P-Chart, Pareto Diagram and Fishbone Diagram
by: Khairun Nadiyah, et al.
Published: (2022-12-01) -
Improvement of magazine production quality using Six Sigma method : case study of a PT.XYZ
by: Hernadewita Hernadewita, et al.
Published: (2019-03-01) -
THE ANALYSIS CAUSE OF CASTING REPAIR WORK WITH PARETO CHART IN PROJECT X
by: Ryobi Irfanto
Published: (2022-04-01)