Integrative Design of an Emergency Resource Predicting-Scheduling-Repairing Method for Rail Track Faults
To solve the problem of track failure in railway system, integrative design of an emergency resource forecasting-scheduling-repairing method is proposed in this paper. In the current railway repair process, resource dispatching centers dispatch transport resources to the fault point for the repair w...
Main Authors: | Dongmei Yuan, Zhigang Lu, Jiangfeng Zhang, Xueping Li, Boyan Jia, Tianxiang Ma |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2019-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/8882224/ |
Similar Items
-
Emergency Repair Scheduling Model for Road Network Integrating Rescheduling Feature
by: Shu-Shun Liu, et al.
Published: (2021-02-01) -
Research on Railway Emergency Resources Scheduling Model under Multiple Uncertainties
by: Zhaoping Tang, et al.
Published: (2023-03-01) -
Reactive Schedule Repair of Job Shops
by: Raheja, Amritpal Singh, et al.
Published: (2003) -
RELATIONSHIP BETWEEN CAPACITY AND SCHEDULING IN RAILWAY SYSTEM
by: Tatiana Molková
Published: (2006-02-01) -
Simulation of rail vehicles ride in Simpack Rail on the curved track
by: Anton E Tarasov, et al.
Published: (2019-04-01)