High Voltage Overhead Power Line Routing under an Objective Observability Criterion

The construction of new high voltage overhead power lines (HVOPLs) has become a controversial issue for electricity companies due to social opposition. Citizens are concerned about how these power lines may have an impact on their lives, basically caused by their effects on health and safety. Visual...

Full description

Bibliographic Details
Main Authors: L. Alfredo Fernandez-Jimenez, Montserrat Mendoza-Villena, Eduardo Garcia-Garrido, Pedro M. Lara-Santillan, Pedro J. Zorzano-Santamaria, Enrique Zorzano-Alba, Alberto Falces
Format: Article
Language:English
Published: MDPI AG 2017-10-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/10/10/1576
Description
Summary:The construction of new high voltage overhead power lines (HVOPLs) has become a controversial issue for electricity companies due to social opposition. Citizens are concerned about how these power lines may have an impact on their lives, basically caused by their effects on health and safety. Visual impact is one of the most easily perceived. Although there are several published works that deal with the assessment of the visual impact produced by HVOPLs, no methodology has been proposed to assess this impact from an objective perspective. This work presents an original methodology which helps to identify the optimal routes for a new HVOPL under an objective observability criterion, enabling the selection of those with the lowest visibility in a zone. The application of the proposed methodology achieves a set of routes that links new HVOPL origin and destination points creating a corridor which includes all possible routes with an observability of its towers under a threshold limit. This methodology is illustrated by a real-life use corresponding to the selection of the route with least observability for a new power line in La Rioja (Spain). The results obtained may help to achieve a consensus between key stakeholders since it is focused on the specific issues of the planned HVOPL and its observability from an objective perspective.
ISSN:1996-1073