The design of system for operative planning of blast furnace production process

A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3) days plan, and 24-hour plan. The system allows smoothing of production process at the bla...

Full description

Bibliographic Details
Main Authors: Malindák Duan, Spiák Ján
Format: Article
Language:English
Published: Technical University of Kosice 1996-12-01
Series:Acta Montanistica Slovaca
Subjects:
Online Access:http://actamont.tuke.sk/pdf/1996/n4/8spisak.pdf
_version_ 1818513617715200000
author Malindák Duan
Spiák Ján
author_facet Malindák Duan
Spiák Ján
author_sort Malindák Duan
collection DOAJ
description A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3) days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.
first_indexed 2024-12-11T00:03:54Z
format Article
id doaj.art-3cca5d1660ef4c2b8e110f9a222973b1
institution Directory Open Access Journal
issn 1335-1788
language English
last_indexed 2024-12-11T00:03:54Z
publishDate 1996-12-01
publisher Technical University of Kosice
record_format Article
series Acta Montanistica Slovaca
spelling doaj.art-3cca5d1660ef4c2b8e110f9a222973b12022-12-22T01:28:23ZengTechnical University of KosiceActa Montanistica Slovaca1335-17881996-12-0114329336The design of system for operative planning of blast furnace production processMalindák DuanSpiák JánA system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3) days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.http://actamont.tuke.sk/pdf/1996/n4/8spisak.pdfoperative planplan hierarchyshort-term planblast furnacesteel plantcapacity smoothingflexible link
spellingShingle Malindák Duan
Spiák Ján
The design of system for operative planning of blast furnace production process
Acta Montanistica Slovaca
operative plan
plan hierarchy
short-term plan
blast furnace
steel plant
capacity smoothing
flexible link
title The design of system for operative planning of blast furnace production process
title_full The design of system for operative planning of blast furnace production process
title_fullStr The design of system for operative planning of blast furnace production process
title_full_unstemmed The design of system for operative planning of blast furnace production process
title_short The design of system for operative planning of blast furnace production process
title_sort design of system for operative planning of blast furnace production process
topic operative plan
plan hierarchy
short-term plan
blast furnace
steel plant
capacity smoothing
flexible link
url http://actamont.tuke.sk/pdf/1996/n4/8spisak.pdf
work_keys_str_mv AT malindakduan thedesignofsystemforoperativeplanningofblastfurnaceproductionprocess
AT spiakjan thedesignofsystemforoperativeplanningofblastfurnaceproductionprocess
AT malindakduan designofsystemforoperativeplanningofblastfurnaceproductionprocess
AT spiakjan designofsystemforoperativeplanningofblastfurnaceproductionprocess