The design of system for operative planning of blast furnace production process
A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3) days plan, and 24-hour plan. The system allows smoothing of production process at the bla...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Technical University of Kosice
1996-12-01
|
Series: | Acta Montanistica Slovaca |
Subjects: | |
Online Access: | http://actamont.tuke.sk/pdf/1996/n4/8spisak.pdf |
_version_ | 1818513617715200000 |
---|---|
author | Malindák Duan Spiák Ján |
author_facet | Malindák Duan Spiák Ján |
author_sort | Malindák Duan |
collection | DOAJ |
description | A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3) days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron. |
first_indexed | 2024-12-11T00:03:54Z |
format | Article |
id | doaj.art-3cca5d1660ef4c2b8e110f9a222973b1 |
institution | Directory Open Access Journal |
issn | 1335-1788 |
language | English |
last_indexed | 2024-12-11T00:03:54Z |
publishDate | 1996-12-01 |
publisher | Technical University of Kosice |
record_format | Article |
series | Acta Montanistica Slovaca |
spelling | doaj.art-3cca5d1660ef4c2b8e110f9a222973b12022-12-22T01:28:23ZengTechnical University of KosiceActa Montanistica Slovaca1335-17881996-12-0114329336The design of system for operative planning of blast furnace production processMalindák DuanSpiák JánA system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3) days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.http://actamont.tuke.sk/pdf/1996/n4/8spisak.pdfoperative planplan hierarchyshort-term planblast furnacesteel plantcapacity smoothingflexible link |
spellingShingle | Malindák Duan Spiák Ján The design of system for operative planning of blast furnace production process Acta Montanistica Slovaca operative plan plan hierarchy short-term plan blast furnace steel plant capacity smoothing flexible link |
title | The design of system for operative planning of blast furnace production process |
title_full | The design of system for operative planning of blast furnace production process |
title_fullStr | The design of system for operative planning of blast furnace production process |
title_full_unstemmed | The design of system for operative planning of blast furnace production process |
title_short | The design of system for operative planning of blast furnace production process |
title_sort | design of system for operative planning of blast furnace production process |
topic | operative plan plan hierarchy short-term plan blast furnace steel plant capacity smoothing flexible link |
url | http://actamont.tuke.sk/pdf/1996/n4/8spisak.pdf |
work_keys_str_mv | AT malindakduan thedesignofsystemforoperativeplanningofblastfurnaceproductionprocess AT spiakjan thedesignofsystemforoperativeplanningofblastfurnaceproductionprocess AT malindakduan designofsystemforoperativeplanningofblastfurnaceproductionprocess AT spiakjan designofsystemforoperativeplanningofblastfurnaceproductionprocess |