GNSS/RNSS Integrated PPP Time Transfer: Performance with Almost Fully Deployed Multiple Constellations and a Priori ISB Constraints Considering Satellite Clock Datums
Currently, the space segment of all the five satellite systems capable of providing precise time transfer services, namely BDS (including BDS-3 and BDS-2), GPS, GLONASS, Galileo, and Quasi-Zenith Satellite System (QZSS), has almost been fully deployed, which will definitely benefit the precise time...
Main Authors: | Gen Pei, Lin Pan, Zhehao Zhang, Wenkun Yu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-05-01
|
Series: | Remote Sensing |
Subjects: | |
Online Access: | https://www.mdpi.com/2072-4292/15/10/2613 |
Similar Items
-
Satellite Availability and Service Performance Evaluation for Next-Generation GNSS, RNSS and LEO Augmentation Constellation
by: Haomeng Cui, et al.
Published: (2021-09-01) -
A Method to Construct Depth Datum Geodesic Height Model for GNSS Bathymetric Survey
by: Chenyang Tian, et al.
Published: (2022-12-01) -
Real-Time PPP Based on the Coupling Estimation of Clock Bias and Orbit Error with Broadcast Ephemeris
by: Shuguo Pan, et al.
Published: (2015-07-01) -
An Approach to Speed up Single-Frequency PPP Convergence with Quad-Constellation GNSS and GIM
by: Changsheng Cai, et al.
Published: (2017-06-01) -
Evaluation of BDS-2 and BDS-3 Satellite Atomic Clock Products and Their Effects on Positioning
by: Shengfeng Gu, et al.
Published: (2021-12-01)