Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ

Inventory management is an essential aspect of supporting good production planning in company business activities. The implementation of inventory management in the company is a primary need. If there is a problem in the supply of raw materials, all the company's operational activities will be...

Full description

Bibliographic Details
Main Authors: Ferry Utama Dwi Putra, Apid Hapid Maksum, Hamdani Hamdani
Format: Article
Language:English
Published: University of Serambi Mekkah 2022-02-01
Series:Jurnal Serambi Engineering
Subjects:
Online Access:https://ojs.serambimekkah.ac.id/jse/article/view/3713
_version_ 1797987325563633664
author Ferry Utama Dwi Putra
Apid Hapid Maksum
Hamdani Hamdani
author_facet Ferry Utama Dwi Putra
Apid Hapid Maksum
Hamdani Hamdani
author_sort Ferry Utama Dwi Putra
collection DOAJ
description Inventory management is an essential aspect of supporting good production planning in company business activities. The implementation of inventory management in the company is a primary need. If there is a problem in the supply of raw materials, all the company's operational activities will be disrupted. Inventories in manufacturing usually consist of raw materials, semi-finished goods, and finished goods or final products. Inventories of arm rear brake materials for the production process often experience shortages due to immature controls. This study aims to determine the inventory control of rear arm brake raw materials using the Economy Order Quantity (EOQ) method at PT. Ciptaunggul Karya Abadi. Based on the discussion results, it was found that ordering raw materials was carried out two times a year with a total order of 621 pieces with 86 pieces of safety stock and will be ordered again when raw materials collected 21 pieces. Total Inventory Cost (TIC), which was initially Rp110.264.235,00, can be saved to Rp70.598.399,00 so that the total savings that occur are Rp39.674.899,00 which is equal to 33.26%.
first_indexed 2024-04-11T07:45:57Z
format Article
id doaj.art-3d7d7ab9a005429bbf78212368f4fe1c
institution Directory Open Access Journal
issn 2528-3561
2541-1934
language English
last_indexed 2024-04-11T07:45:57Z
publishDate 2022-02-01
publisher University of Serambi Mekkah
record_format Article
series Jurnal Serambi Engineering
spelling doaj.art-3d7d7ab9a005429bbf78212368f4fe1c2022-12-22T04:36:16ZengUniversity of Serambi MekkahJurnal Serambi Engineering2528-35612541-19342022-02-017110.32672/jse.v7i1.37132934Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQFerry Utama Dwi Putra0Apid Hapid MaksumHamdani HamdaniTeknik Industri, Fakultas Teknik, Universitas Singaperbangsa Karawang, KarawangInventory management is an essential aspect of supporting good production planning in company business activities. The implementation of inventory management in the company is a primary need. If there is a problem in the supply of raw materials, all the company's operational activities will be disrupted. Inventories in manufacturing usually consist of raw materials, semi-finished goods, and finished goods or final products. Inventories of arm rear brake materials for the production process often experience shortages due to immature controls. This study aims to determine the inventory control of rear arm brake raw materials using the Economy Order Quantity (EOQ) method at PT. Ciptaunggul Karya Abadi. Based on the discussion results, it was found that ordering raw materials was carried out two times a year with a total order of 621 pieces with 86 pieces of safety stock and will be ordered again when raw materials collected 21 pieces. Total Inventory Cost (TIC), which was initially Rp110.264.235,00, can be saved to Rp70.598.399,00 so that the total savings that occur are Rp39.674.899,00 which is equal to 33.26%.https://ojs.serambimekkah.ac.id/jse/article/view/3713pt. ciptaunggul karya abadi, inventory management, economic order quantity, reorder point, safety stock.
spellingShingle Ferry Utama Dwi Putra
Apid Hapid Maksum
Hamdani Hamdani
Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ
Jurnal Serambi Engineering
pt. ciptaunggul karya abadi, inventory management, economic order quantity, reorder point, safety stock.
title Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ
title_full Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ
title_fullStr Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ
title_full_unstemmed Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ
title_short Analisis Penerapan Manajemen Persediaan Bahan Baku Arm Rear Brake Kyea dengan Metode EOQ
title_sort analisis penerapan manajemen persediaan bahan baku arm rear brake kyea dengan metode eoq
topic pt. ciptaunggul karya abadi, inventory management, economic order quantity, reorder point, safety stock.
url https://ojs.serambimekkah.ac.id/jse/article/view/3713
work_keys_str_mv AT ferryutamadwiputra analisispenerapanmanajemenpersediaanbahanbakuarmrearbrakekyeadenganmetodeeoq
AT apidhapidmaksum analisispenerapanmanajemenpersediaanbahanbakuarmrearbrakekyeadenganmetodeeoq
AT hamdanihamdani analisispenerapanmanajemenpersediaanbahanbakuarmrearbrakekyeadenganmetodeeoq