Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method
This research is for one of the pharmaceutical companies in Indonesia. The company's production area is composed of two parts, namely a Black Area and a Grey Area for processing and packaging. There are four types of packaging in the Secondary Packaging Area. Each type of packaging uses dif...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitas Indonesia
2015-12-01
|
Series: | International Journal of Technology |
Subjects: | |
Online Access: | http://ijtech.eng.ui.ac.id/article/view/1462 |
_version_ | 1797968051285524480 |
---|---|
author | Inaki Maulida Hakim Vidyahningtyas Istiyanti |
author_facet | Inaki Maulida Hakim Vidyahningtyas Istiyanti |
author_sort | Inaki Maulida Hakim |
collection | DOAJ |
description | This research is for one of the pharmaceutical
companies in Indonesia. The company's production area is composed of two parts,
namely a Black Area and a Grey Area for processing and packaging. There are
four types of packaging in the Secondary Packaging Area. Each type of packaging
uses different processes, but there are also some processes that are used by
all types of packaging. Based on these observations, the layout of the
production area for secondary packaging in the pharmaceutical company is not
optimal because the material handling distances are still quite long and there
are some similar processes for same packaging type that are not adjacent, so
that the production process is inefficient. This study aims to redesign the
layout in the area with the Computerized Relationship Layout Planning (CORELAP)
method. Data such as the name of the process, the order of the process, and the
relationship between processes into the Activity Relationship Chart (ARC), are
subsequently processed to obtain the Total Closeness Rating (TCR) values for each
process iterated with the CORELAP method. From the calculations, the proposed
layout has material handling distances that are shortened by 9.017% compared
with the current layout. The same type of packaging processes are located in
adjacent positions. |
first_indexed | 2024-04-11T02:40:56Z |
format | Article |
id | doaj.art-3dd6adc859a24ab8a99351b0b07d5d52 |
institution | Directory Open Access Journal |
issn | 2086-9614 2087-2100 |
language | English |
last_indexed | 2024-04-11T02:40:56Z |
publishDate | 2015-12-01 |
publisher | Universitas Indonesia |
record_format | Article |
series | International Journal of Technology |
spelling | doaj.art-3dd6adc859a24ab8a99351b0b07d5d522023-01-02T19:05:23ZengUniversitas IndonesiaInternational Journal of Technology2086-96142087-21002015-12-01661006101610.14716/ijtech.v6i6.14621462Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap MethodInaki Maulida Hakim0Vidyahningtyas Istiyanti1Department of Industrial Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Depok 16424, IndonesiaDepartment of Industrial Engineering, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Depok 16424, IndonesiaThis research is for one of the pharmaceutical companies in Indonesia. The company's production area is composed of two parts, namely a Black Area and a Grey Area for processing and packaging. There are four types of packaging in the Secondary Packaging Area. Each type of packaging uses different processes, but there are also some processes that are used by all types of packaging. Based on these observations, the layout of the production area for secondary packaging in the pharmaceutical company is not optimal because the material handling distances are still quite long and there are some similar processes for same packaging type that are not adjacent, so that the production process is inefficient. This study aims to redesign the layout in the area with the Computerized Relationship Layout Planning (CORELAP) method. Data such as the name of the process, the order of the process, and the relationship between processes into the Activity Relationship Chart (ARC), are subsequently processed to obtain the Total Closeness Rating (TCR) values for each process iterated with the CORELAP method. From the calculations, the proposed layout has material handling distances that are shortened by 9.017% compared with the current layout. The same type of packaging processes are located in adjacent positions.http://ijtech.eng.ui.ac.id/article/view/1462ARC, CORELAP, Facility layout planning, Pharmaceutical, Secondary packaging |
spellingShingle | Inaki Maulida Hakim Vidyahningtyas Istiyanti Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method International Journal of Technology ARC, CORELAP, Facility layout planning, Pharmaceutical, Secondary packaging |
title | Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method |
title_full | Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method |
title_fullStr | Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method |
title_full_unstemmed | Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method |
title_short | Improvement of Layout Production Facilities for a Secondary Packaging Area of a Pharmaceutical Company in Indonesia using the Corelap Method |
title_sort | improvement of layout production facilities for a secondary packaging area of a pharmaceutical company in indonesia using the corelap method |
topic | ARC, CORELAP, Facility layout planning, Pharmaceutical, Secondary packaging |
url | http://ijtech.eng.ui.ac.id/article/view/1462 |
work_keys_str_mv | AT inakimaulidahakim improvementoflayoutproductionfacilitiesforasecondarypackagingareaofapharmaceuticalcompanyinindonesiausingthecorelapmethod AT vidyahningtyasistiyanti improvementoflayoutproductionfacilitiesforasecondarypackagingareaofapharmaceuticalcompanyinindonesiausingthecorelapmethod |