Time of use electricity pricing in power system planning and operation: Case study of Nepalese power system
The difference between load demand in the off-peak and peak period is usually high in the context of Nepal, and the high peak load for a short time is the main reason for insufficiency in electricity, frequent electricity outage, and poor power quality. This paper investigates the effectiveness of t...
Main Authors: | Sunil Simkhada, Mani Niraula, Prabesh Raj Ojha, Yogesh Layalu, Ajay Singh, Rakesh Gwachha, Ashish Shrestha |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2022-04-01
|
Series: | Energy Reports |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352484721012464 |
Similar Items
-
Adaptive quantum-inspired evolutionary algorithm for optimizing power losses by dynamic load allocation on distributed generators
by: Manikanta Gopisetti, et al.
Published: (2019-01-01) -
A Cost Effective Solution to Security Constrained Unit Commitment and Dispatch Problem using Hybrid Search Algorithm
by: Prashar Sushil, et al.
Published: (2020-01-01) -
Fault Detection in Distribution Network with the Cauchy-M Estimate—RVFLN Method
by: Cem Haydaroğlu, et al.
Published: (2022-12-01) -
Optimal Placement and Sizing of Distributed Generators Based on Swarm Moth Flame Optimization
by: Zhukui Tan, et al.
Published: (2021-04-01) -
Optimal Battery Energy Storage System Management with Wind Turbine Generator in Unbalanced Low Power Distribution System
by: Samarjit Patnaik, et al.
Published: (2022-01-01)