Optimization of Load Distribution Method for Hydropower Units Based on Output Fluctuation Constraint and Double-Layer Nested Model
During the load distribution of hydropower units, the frequent crossing of vibration zones as well as large output fluctuations affect the stability of the power station. A multi-objective double-layer intelligent nesting model that considers the constraint of the output fluctuation of units is prop...
Main Authors: | Hong Pan, Zhengliang Luo, Chenyang Hang, Yuan Zheng, Fang Feng, Xiaonan Zheng |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-02-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/12/5/662 |
Similar Items
-
Advancement and capacity allocation analysis of variable speed hydropower units for suppressing wind power fluctuations
by: Chunyang Gao, et al.
Published: (2022-12-01) -
Optimal operation of cascaded hydropower plants in hydro-solar complementary systems considering the risk of unit vibration zone crossing
by: Qin Haoting, et al.
Published: (2023-05-01) -
Analysis of the Power Fluctuations Caused by the Unstable Flow in the Trifurcation of Multi-Turbine Diversion Systems with Common Penstock in Hydropower Units
by: Xinran Guo, et al.
Published: (2019-07-01) -
Hydraulic Vibration and Possible Exciting Sources Analysis in a Hydropower System
by: Aili Shen, et al.
Published: (2021-06-01) -
Control strategy of vibration zone avoidance based on a hydropower-battery hybrid unit
by: Yiwen Liao, et al.
Published: (2023-09-01)