Creation of a network model on the basis of a universal sequence of construction works

Introduction. Building information modeling is the main direction of development of automated design and control systems. An important component of information modeling is the transfer of data into construction management systems. The most complicated issue is the problem of creating the correct gra...

Full description

Bibliographic Details
Main Authors: Irina V. Karakozova, Alexander S. Pavlov
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU) 2023-01-01
Series:Stroitel’stvo: Nauka i Obrazovanie
Subjects:
Online Access:https://www.nso-journal.ru/jour/article/view/17
_version_ 1797321624059379712
author Irina V. Karakozova
Alexander S. Pavlov
author_facet Irina V. Karakozova
Alexander S. Pavlov
author_sort Irina V. Karakozova
collection DOAJ
description Introduction. Building information modeling is the main direction of development of automated design and control systems. An important component of information modeling is the transfer of data into construction management systems. The most complicated issue is the problem of creating the correct graph topology relevant to the process sequence and construction management experience. The development of automated progress schedule compilation system based on the use of a universal sequence developed earlier is examined.Materials and methods. As a result of the analysis of the progress schedule compilation process, the topology creation algorithm is divided into several stages. At the first stage, a text description of the information model is given, which is then converted into a list of building or structure elements. The list of elements should be transformed into the work item list and then supplemented with work items not reflected in the list of elements. This is a separate complex task, which is not examined in this study, and is the direction of further research by the authors. At the next stage, the work items in the list are assigned codes that define the location of the scope of works in time and space.Results. An algorithm for converting the work item list into a coherent work schedule, the topology of which takes into account the spatial location of the work area and the sequence of interrelated processes over time, has been developed. The sequence of works is determined by a preliminarily designed universal list. The list of requirements for the information produced by BIM models is developed. Splitting the algorithm into stages allows for manual correction of the work item list and the properties of work items, if necessary.Conclusions. The developed method allows for automation of the processes of creating construction plans based on the list of building elements and universal work sequence. At any implementation stage, the work item list may be interactively changed and supplemented. In the future, it is necessary to form a set of parameters for structural elements that will allow automating the choice of technological processes.
first_indexed 2024-03-08T05:01:12Z
format Article
id doaj.art-3f32de94c9944777b439a10bf9228cbb
institution Directory Open Access Journal
issn 2305-5502
language English
last_indexed 2024-03-08T05:01:12Z
publishDate 2023-01-01
publisher Moscow State University of Civil Engineering (MGSU)
record_format Article
series Stroitel’stvo: Nauka i Obrazovanie
spelling doaj.art-3f32de94c9944777b439a10bf9228cbb2024-02-07T11:27:48ZengMoscow State University of Civil Engineering (MGSU)Stroitel’stvo: Nauka i Obrazovanie2305-55022023-01-0110311610.22227/2305-5502.2020.3.116Creation of a network model on the basis of a universal sequence of construction worksIrina V. Karakozova0Alexander S. Pavlov1Moscow State Autonomous Institution Research analytical center (NIAZ); Moscow State University of Civil Engineering (National Research University) (MGSU)All-Russian Research Institute for Nuclear Power Plants Operation (VNIIAES)Introduction. Building information modeling is the main direction of development of automated design and control systems. An important component of information modeling is the transfer of data into construction management systems. The most complicated issue is the problem of creating the correct graph topology relevant to the process sequence and construction management experience. The development of automated progress schedule compilation system based on the use of a universal sequence developed earlier is examined.Materials and methods. As a result of the analysis of the progress schedule compilation process, the topology creation algorithm is divided into several stages. At the first stage, a text description of the information model is given, which is then converted into a list of building or structure elements. The list of elements should be transformed into the work item list and then supplemented with work items not reflected in the list of elements. This is a separate complex task, which is not examined in this study, and is the direction of further research by the authors. At the next stage, the work items in the list are assigned codes that define the location of the scope of works in time and space.Results. An algorithm for converting the work item list into a coherent work schedule, the topology of which takes into account the spatial location of the work area and the sequence of interrelated processes over time, has been developed. The sequence of works is determined by a preliminarily designed universal list. The list of requirements for the information produced by BIM models is developed. Splitting the algorithm into stages allows for manual correction of the work item list and the properties of work items, if necessary.Conclusions. The developed method allows for automation of the processes of creating construction plans based on the list of building elements and universal work sequence. At any implementation stage, the work item list may be interactively changed and supplemented. In the future, it is necessary to form a set of parameters for structural elements that will allow automating the choice of technological processes.https://www.nso-journal.ru/jour/article/view/17building information modelingbuilding elementsbuilding structuresbuilding and construction worksschedule planproject networktopology
spellingShingle Irina V. Karakozova
Alexander S. Pavlov
Creation of a network model on the basis of a universal sequence of construction works
Stroitel’stvo: Nauka i Obrazovanie
building information modeling
building elements
building structures
building and construction works
schedule plan
project network
topology
title Creation of a network model on the basis of a universal sequence of construction works
title_full Creation of a network model on the basis of a universal sequence of construction works
title_fullStr Creation of a network model on the basis of a universal sequence of construction works
title_full_unstemmed Creation of a network model on the basis of a universal sequence of construction works
title_short Creation of a network model on the basis of a universal sequence of construction works
title_sort creation of a network model on the basis of a universal sequence of construction works
topic building information modeling
building elements
building structures
building and construction works
schedule plan
project network
topology
url https://www.nso-journal.ru/jour/article/view/17
work_keys_str_mv AT irinavkarakozova creationofanetworkmodelonthebasisofauniversalsequenceofconstructionworks
AT alexanderspavlov creationofanetworkmodelonthebasisofauniversalsequenceofconstructionworks