Markov-based performance evaluation and availability optimization of the boiler–furnace system in coal-fired thermal power plant using PSO
The appropriate maintenance strategy is essential for maintaining the thermal power plant highly reliable. The thermal power plant is a complex system that consists of various subsystems connected either in series or parallel configuration. The boiler–furnace (BF) system is one of the most critical...
Main Authors: | Hanumant Jagtap, Anand Bewoor, Ravinder Kumar, Mohammad Hossein Ahmadi, Giulio Lorenzini |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-11-01
|
Series: | Energy Reports |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352484719308029 |
Similar Items
-
RAM analysis and availability optimization of thermal power plant water circulation system using PSO
by: Hanumant P. Jagtap, et al.
Published: (2021-11-01) -
Availability analysis of thermal power plant boiler air circulation system using Markov approach
by: Ravinder Kumar
Published: (2014-01-01) -
Optimizing Availability of a Framework in Series Configuration Utilizing Markov Model and Monte Carlo Simulation Techniques
by: Mansoor Ahmed Siddiqui, et al.
Published: (2017-06-01) -
Combining Markov and Semi-Markov Modelling for Assessing Availability and Cybersecurity of Cloud and IoT Systems
by: Vyacheslav Kharchenko, et al.
Published: (2022-08-01) -
Simulation Modelling In a Availability Thermal Power Plant
by: Sorabh Gupta, et al.
Published: (2014-06-01)