Una regla de secuencia en la industria cerámica. Aplicación a un caso real

Undoubtedly, the great competition in every industry is forcing companies to modify its view of the scheduling problem. The present paper is focus on the tiles industry. From the study of a case, a scheduling problem into a flow shop system will be described. After a review for the different alterna...

Full description

Bibliographic Details
Main Authors: Vicens, E., Alfaro, J. J., Guarch, J. J.
Format: Article
Language:English
Published: Elsevier 2000-10-01
Series:Boletín de la Sociedad Española de Cerámica y Vidrio
Subjects:
Online Access:http://ceramicayvidrio.revistas.csic.es/index.php/ceramicayvidrio/article/view/1063/1091
_version_ 1811204784097591296
author Vicens, E.
Alfaro, J. J.
Guarch, J. J.
author_facet Vicens, E.
Alfaro, J. J.
Guarch, J. J.
author_sort Vicens, E.
collection DOAJ
description Undoubtedly, the great competition in every industry is forcing companies to modify its view of the scheduling problem. The present paper is focus on the tiles industry. From the study of a case, a scheduling problem into a flow shop system will be described. After a review for the different alternatives that exit to solve the problem, our proposal is based on a heuristic approach. This approach addresses the problem of assigning and sequencing different production orders in a flow-shop system. Computational testing shows that the heuristic rule provides better results in reducing setup times and improving resources efficiency.<br><br>Es indudable que la gran competencia en todos los sectores industriales está obligando a las empresas a modificar sus hábitos de planificación y programación de la producción. El presente trabajo está centrado en el sector cerámico y pretende abordar desde el estudio de un caso real los problemas derivados de una incorrecta programación de la producción. Tras un repaso por las diferentes alternativas que existen para abordar un correcto control de la actividad productiva (PAC), se propone una heurística que aborda el problema de asignar y secuenciar diferentes y numerosas órdenes de fabricación en un sistema productivo que atiende a una configuración Flow-shop. Tras la adopción de la regla heurística y la experimentación mediante diferentes simulaciones, se aportan destacadas mejoras tanto en las reducciones de los tiempos de fabricación empleados como en la utilización de recursos materiales y humanos.
first_indexed 2024-04-12T03:19:34Z
format Article
id doaj.art-3f5dd3d528a34c828fbc955654b4ffa1
institution Directory Open Access Journal
issn 0366-3175
language English
last_indexed 2024-04-12T03:19:34Z
publishDate 2000-10-01
publisher Elsevier
record_format Article
series Boletín de la Sociedad Española de Cerámica y Vidrio
spelling doaj.art-3f5dd3d528a34c828fbc955654b4ffa12022-12-22T03:49:57ZengElsevierBoletín de la Sociedad Española de Cerámica y Vidrio0366-31752000-10-01395657663Una regla de secuencia en la industria cerámica. Aplicación a un caso realVicens, E.Alfaro, J. J.Guarch, J. J.Undoubtedly, the great competition in every industry is forcing companies to modify its view of the scheduling problem. The present paper is focus on the tiles industry. From the study of a case, a scheduling problem into a flow shop system will be described. After a review for the different alternatives that exit to solve the problem, our proposal is based on a heuristic approach. This approach addresses the problem of assigning and sequencing different production orders in a flow-shop system. Computational testing shows that the heuristic rule provides better results in reducing setup times and improving resources efficiency.<br><br>Es indudable que la gran competencia en todos los sectores industriales está obligando a las empresas a modificar sus hábitos de planificación y programación de la producción. El presente trabajo está centrado en el sector cerámico y pretende abordar desde el estudio de un caso real los problemas derivados de una incorrecta programación de la producción. Tras un repaso por las diferentes alternativas que existen para abordar un correcto control de la actividad productiva (PAC), se propone una heurística que aborda el problema de asignar y secuenciar diferentes y numerosas órdenes de fabricación en un sistema productivo que atiende a una configuración Flow-shop. Tras la adopción de la regla heurística y la experimentación mediante diferentes simulaciones, se aportan destacadas mejoras tanto en las reducciones de los tiempos de fabricación empleados como en la utilización de recursos materiales y humanos.http://ceramicayvidrio.revistas.csic.es/index.php/ceramicayvidrio/article/view/1063/1091Schedulingtile industrysequencingProgramaciónsecuenciaciónindustria cerámica
spellingShingle Vicens, E.
Alfaro, J. J.
Guarch, J. J.
Una regla de secuencia en la industria cerámica. Aplicación a un caso real
Boletín de la Sociedad Española de Cerámica y Vidrio
Scheduling
tile industry
sequencing
Programación
secuenciación
industria cerámica
title Una regla de secuencia en la industria cerámica. Aplicación a un caso real
title_full Una regla de secuencia en la industria cerámica. Aplicación a un caso real
title_fullStr Una regla de secuencia en la industria cerámica. Aplicación a un caso real
title_full_unstemmed Una regla de secuencia en la industria cerámica. Aplicación a un caso real
title_short Una regla de secuencia en la industria cerámica. Aplicación a un caso real
title_sort una regla de secuencia en la industria ceramica aplicacion a un caso real
topic Scheduling
tile industry
sequencing
Programación
secuenciación
industria cerámica
url http://ceramicayvidrio.revistas.csic.es/index.php/ceramicayvidrio/article/view/1063/1091
work_keys_str_mv AT vicense unaregladesecuenciaenlaindustriaceramicaaplicacionauncasoreal
AT alfarojj unaregladesecuenciaenlaindustriaceramicaaplicacionauncasoreal
AT guarchjj unaregladesecuenciaenlaindustriaceramicaaplicacionauncasoreal