A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE

Truck allocation problems are considered as one of the most substantial factors in the achievement of planned production capacity in the mining industry. Traditional truck allocation techniques (e.g. mathematical programming, queueing theories) have undergone different levels of simplifications in f...

Full description

Bibliographic Details
Main Authors: Amin Moniri-Morad, Mohammad Pourgol-Mohammad, Hamid Aghababaei, Javad Sattarvand
Format: Article
Language:English
Published: Faculty of Mining, Geology and Petroleum Engineering 2019-01-01
Series:Rudarsko-geološko-naftni Zbornik
Subjects:
Online Access:https://hrcak.srce.hr/file/332034
_version_ 1797207331766796288
author Amin Moniri-Morad
Mohammad Pourgol-Mohammad
Hamid Aghababaei
Javad Sattarvand
author_facet Amin Moniri-Morad
Mohammad Pourgol-Mohammad
Hamid Aghababaei
Javad Sattarvand
author_sort Amin Moniri-Morad
collection DOAJ
description Truck allocation problems are considered as one of the most substantial factors in the achievement of planned production capacity in the mining industry. Traditional truck allocation techniques (e.g. mathematical programming, queueing theories) have undergone different levels of simplifications in formulating actual haulage operations under heterogeneous circumstances. In this study, the truck allocation problem is analysed through the development of the simulation-based optimization (SBO) method for the optimization of truck assignment considering uncertainties during fleet operation. This method provides an integrated structure by the simultaneous combination of optimization and stochastic discrete-event simulation. The objective function is to minimize the total number of trucks for haulage operation with discrete-event simulation employed to model the constraints. As a case study, the fleet operation of the Sungun copper mine is investigated to accomplish an optimal truck allocation for various working benches in the mine site. Operation details are evaluated through different indicators such as utilization, waiting times, and the amount of transported materials for each working bench. Finally, the operation bottlenecks are recognized for each situation.
first_indexed 2024-04-24T09:21:13Z
format Article
id doaj.art-3f658493f32143be80e2fb23f296fa0a
institution Directory Open Access Journal
issn 0353-4529
1849-0409
language English
last_indexed 2024-04-24T09:21:13Z
publishDate 2019-01-01
publisher Faculty of Mining, Geology and Petroleum Engineering
record_format Article
series Rudarsko-geološko-naftni Zbornik
spelling doaj.art-3f658493f32143be80e2fb23f296fa0a2024-04-15T15:49:25ZengFaculty of Mining, Geology and Petroleum EngineeringRudarsko-geološko-naftni Zbornik0353-45291849-04092019-01-01344576510.17794/rgn.2019.4.6A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINEAmin Moniri-Morad0Mohammad Pourgol-Mohammad1Hamid Aghababaei2Javad Sattarvand3Department of Mining Engineering, Sahand University of Technology, 51335-1996, Tabriz, IranDepartment of Mechanical Engineering, Sahand University of Technology, 51335-1996, Tabriz, IranDepartment of Mining Engineering, Sahand University of Technology, 51335-1996, Tabriz, IranDepartment of Mining and Metallurgical Engineering, University of Nevada, 89557, Reno, USATruck allocation problems are considered as one of the most substantial factors in the achievement of planned production capacity in the mining industry. Traditional truck allocation techniques (e.g. mathematical programming, queueing theories) have undergone different levels of simplifications in formulating actual haulage operations under heterogeneous circumstances. In this study, the truck allocation problem is analysed through the development of the simulation-based optimization (SBO) method for the optimization of truck assignment considering uncertainties during fleet operation. This method provides an integrated structure by the simultaneous combination of optimization and stochastic discrete-event simulation. The objective function is to minimize the total number of trucks for haulage operation with discrete-event simulation employed to model the constraints. As a case study, the fleet operation of the Sungun copper mine is investigated to accomplish an optimal truck allocation for various working benches in the mine site. Operation details are evaluated through different indicators such as utilization, waiting times, and the amount of transported materials for each working bench. Finally, the operation bottlenecks are recognized for each situation.https://hrcak.srce.hr/file/332034haul truck allocation optimization discrete-event simulation production capacity
spellingShingle Amin Moniri-Morad
Mohammad Pourgol-Mohammad
Hamid Aghababaei
Javad Sattarvand
A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE
Rudarsko-geološko-naftni Zbornik
haul truck allocation
 optimization
 discrete-event simulation
 production capacity
title A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE
title_full A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE
title_fullStr A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE
title_full_unstemmed A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE
title_short A METHODOLOGY FOR TRUCK ALLOCATION PROBLEMS CONSIDERING DYNAMIC CIRCUMSTANCES IN OPEN PIT MINES, CASE STUDY OF THE SUNGUN COPPER MINE
title_sort methodology for truck allocation problems considering dynamic circumstances in open pit mines case study of the sungun copper mine
topic haul truck allocation
 optimization
 discrete-event simulation
 production capacity
url https://hrcak.srce.hr/file/332034
work_keys_str_mv AT aminmonirimorad amethodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT mohammadpourgolmohammad amethodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT hamidaghababaei amethodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT javadsattarvand amethodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT aminmonirimorad methodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT mohammadpourgolmohammad methodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT hamidaghababaei methodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine
AT javadsattarvand methodologyfortruckallocationproblemsconsideringdynamiccircumstancesinopenpitminescasestudyofthesunguncoppermine