Study on Flood Control Dispatching Rehearsal in Shenzhen River Basin

At present,it is difficult to carry out large-scale flood control project construction in Shenzhen River Basin.Therefore,to ensure the flood control safety of Shenzhen Reservoir and downstream Shenzhen River,this paper follows the requirements of the forecast,early warning,rehearsal,and preplan prop...

Full description

Bibliographic Details
Main Authors: LENG Yubo, LIU Xunping, LIU Chuan
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2022-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.011