Study on Flood Control Dispatching Rehearsal in Shenzhen River Basin
At present,it is difficult to carry out large-scale flood control project construction in Shenzhen River Basin.Therefore,to ensure the flood control safety of Shenzhen Reservoir and downstream Shenzhen River,this paper follows the requirements of the forecast,early warning,rehearsal,and preplan prop...
| Những tác giả chính: | , , |
|---|---|
| Định dạng: | Bài viết |
| Ngôn ngữ: | zho |
| Được phát hành: |
Editorial Office of Pearl River
2022-01-01
|
| Loạt: | Renmin Zhujiang |
| Những chủ đề: | |
| Truy cập trực tuyến: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.011 |