RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)

In the manufacturing process Bus and Mini Bus, a lot of the raw materials required. Raw materials are stored at many warehouses (especially on Body PT. XYZ Malang). Materials / goods are highly vulnerable to lost or stolen. The most influential factor in it is the counting system inventory / materia...

Full description

Bibliographic Details
Main Authors: Denny Lukianto Kumala, Soetam Rizky Wicaksono
Format: Article
Language:Indonesian
Published: Fakultas Sains dan Teknologi, Universitas Ibrahimy 2017-12-01
Series:Jurnal Ilmiah Informatika
Subjects:
Online Access:https://journal.ibrahimy.ac.id/index.php/JIMI/article/view/467/452
_version_ 1811280283094220800
author Denny Lukianto Kumala
Soetam Rizky Wicaksono
author_facet Denny Lukianto Kumala
Soetam Rizky Wicaksono
author_sort Denny Lukianto Kumala
collection DOAJ
description In the manufacturing process Bus and Mini Bus, a lot of the raw materials required. Raw materials are stored at many warehouses (especially on Body PT. XYZ Malang). Materials / goods are highly vulnerable to lost or stolen. The most influential factor in it is the counting system inventory / materials and administration. These changes will have an impact on the process of goods more accurate calculation based on the demand of production. Losses will have a greater likelihood of being used if the system can not address the calculation of the goods/raw materials better.And administration system that can cope with the calculation of the goods/raw materials are better here is a system that can calculate expenditures for production based on the incoming bill alone, and can calculate the receipt of goods in accordance with the letter received by the supplier. The system can also provide reports based on existing transactions during a certain period.With the inventory system and the administration is then the difference between the goods that previously occurred can be minimized and raw material inventory accounting system can work better.
first_indexed 2024-04-13T01:12:00Z
format Article
id doaj.art-40197e5797a6470692408f4e10f25045
institution Directory Open Access Journal
issn 2549-7480
2549-6301
language Indonesian
last_indexed 2024-04-13T01:12:00Z
publishDate 2017-12-01
publisher Fakultas Sains dan Teknologi, Universitas Ibrahimy
record_format Article
series Jurnal Ilmiah Informatika
spelling doaj.art-40197e5797a6470692408f4e10f250452022-12-22T03:09:07ZindFakultas Sains dan Teknologi, Universitas IbrahimyJurnal Ilmiah Informatika2549-74802549-63012017-12-012214615210.35316/jimi.v2i2.467RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG) Denny Lukianto Kumala0 Soetam Rizky Wicaksono1Program Studi Sistem Informasi, Fakultas Sains dan Teknologi Universitas Ma ChungProgram Studi Sistem Informasi, Fakultas Sains dan Teknologi Universitas Ma ChungIn the manufacturing process Bus and Mini Bus, a lot of the raw materials required. Raw materials are stored at many warehouses (especially on Body PT. XYZ Malang). Materials / goods are highly vulnerable to lost or stolen. The most influential factor in it is the counting system inventory / materials and administration. These changes will have an impact on the process of goods more accurate calculation based on the demand of production. Losses will have a greater likelihood of being used if the system can not address the calculation of the goods/raw materials better.And administration system that can cope with the calculation of the goods/raw materials are better here is a system that can calculate expenditures for production based on the incoming bill alone, and can calculate the receipt of goods in accordance with the letter received by the supplier. The system can also provide reports based on existing transactions during a certain period.With the inventory system and the administration is then the difference between the goods that previously occurred can be minimized and raw material inventory accounting system can work better.https://journal.ibrahimy.ac.id/index.php/JIMI/article/view/467/452warehouseinventoryadministrationautobody
spellingShingle Denny Lukianto Kumala
Soetam Rizky Wicaksono
RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)
Jurnal Ilmiah Informatika
warehouse
inventory
administration
autobody
title RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)
title_full RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)
title_fullStr RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)
title_full_unstemmed RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)
title_short RANCANG BANGUN SISTEM INFORMASI PERSEDIAAN BAHAN BAKU DAN ADMINISTRASI GUDANG MAJEMUK (STUDI KASUS KAROSERI PT. XYZ MALANG)
title_sort rancang bangun sistem informasi persediaan bahan baku dan administrasi gudang majemuk studi kasus karoseri pt xyz malang
topic warehouse
inventory
administration
autobody
url https://journal.ibrahimy.ac.id/index.php/JIMI/article/view/467/452
work_keys_str_mv AT dennylukiantokumala rancangbangunsisteminformasipersediaanbahanbakudanadministrasigudangmajemukstudikasuskaroseriptxyzmalang
AT soetamrizkywicaksono rancangbangunsisteminformasipersediaanbahanbakudanadministrasigudangmajemukstudikasuskaroseriptxyzmalang