Explosion risk assessment for already installed equipment

The equipment of installations for the processing, transport or storage of flammable substances which may generate an explosive atmosphere, in or around them, must be assessed in terms of the risk of explosions, both when they are put into operation or when the installation is modified and periodica...

Full description

Bibliographic Details
Main Authors: Părăian Mihaela, Jurca Adrian-Marius, Matei Dan, Mangu Sorin Iuliu
Format: Article
Language:English
Published: EDP Sciences 2022-01-01
Series:MATEC Web of Conferences
Online Access:https://www.matec-conferences.org/articles/matecconf/pdf/2022/20/matecconf_simpro2022_00005.pdf
_version_ 1828062175907807232
author Părăian Mihaela
Jurca Adrian-Marius
Matei Dan
Mangu Sorin Iuliu
author_facet Părăian Mihaela
Jurca Adrian-Marius
Matei Dan
Mangu Sorin Iuliu
author_sort Părăian Mihaela
collection DOAJ
description The equipment of installations for the processing, transport or storage of flammable substances which may generate an explosive atmosphere, in or around them, must be assessed in terms of the risk of explosions, both when they are put into operation or when the installation is modified and periodically for verify that the initial level of protection is maintained. The purpose of the assessment is to establish appropriate protective measures to prevent sources of ignition that could initiate explosive atmospheres. Explosion risk assessment is an obligation of the employer who must draw up an explosion protection document, as regulated in GD 1058/2006 transposing European Directive 1999/92/EC. The explosion risk assessment process focuses primarily on the formation of explosive atmospheres and then on the presence and activation of ignition sources. The principle of explosion protection is to reduce the probability of an ignition source occurring at the same time as the explosive atmosphere, to a minimum acceptable level according to the applicable norms and standards. The paper presents some aspects regarding the evaluation of the risk of explosions to already installed equipment, assembled in an installation, depending on the specific conditions.
first_indexed 2024-04-10T22:26:05Z
format Article
id doaj.art-4031e017b3384404917750a1c8038d3e
institution Directory Open Access Journal
issn 2261-236X
language English
last_indexed 2024-04-10T22:26:05Z
publishDate 2022-01-01
publisher EDP Sciences
record_format Article
series MATEC Web of Conferences
spelling doaj.art-4031e017b3384404917750a1c8038d3e2023-01-17T09:15:39ZengEDP SciencesMATEC Web of Conferences2261-236X2022-01-013730000510.1051/matecconf/202237300005matecconf_simpro2022_00005Explosion risk assessment for already installed equipmentPărăian Mihaela0Jurca Adrian-Marius1Matei Dan2Mangu Sorin Iuliu3National Institute of Research and Development for Safety in Mines and Explosion ProtectionNational Institute of Research and Development for Safety in Mines and Explosion ProtectionEuro Eco-tech SRLUniversity of PetroşaniThe equipment of installations for the processing, transport or storage of flammable substances which may generate an explosive atmosphere, in or around them, must be assessed in terms of the risk of explosions, both when they are put into operation or when the installation is modified and periodically for verify that the initial level of protection is maintained. The purpose of the assessment is to establish appropriate protective measures to prevent sources of ignition that could initiate explosive atmospheres. Explosion risk assessment is an obligation of the employer who must draw up an explosion protection document, as regulated in GD 1058/2006 transposing European Directive 1999/92/EC. The explosion risk assessment process focuses primarily on the formation of explosive atmospheres and then on the presence and activation of ignition sources. The principle of explosion protection is to reduce the probability of an ignition source occurring at the same time as the explosive atmosphere, to a minimum acceptable level according to the applicable norms and standards. The paper presents some aspects regarding the evaluation of the risk of explosions to already installed equipment, assembled in an installation, depending on the specific conditions.https://www.matec-conferences.org/articles/matecconf/pdf/2022/20/matecconf_simpro2022_00005.pdf
spellingShingle Părăian Mihaela
Jurca Adrian-Marius
Matei Dan
Mangu Sorin Iuliu
Explosion risk assessment for already installed equipment
MATEC Web of Conferences
title Explosion risk assessment for already installed equipment
title_full Explosion risk assessment for already installed equipment
title_fullStr Explosion risk assessment for already installed equipment
title_full_unstemmed Explosion risk assessment for already installed equipment
title_short Explosion risk assessment for already installed equipment
title_sort explosion risk assessment for already installed equipment
url https://www.matec-conferences.org/articles/matecconf/pdf/2022/20/matecconf_simpro2022_00005.pdf
work_keys_str_mv AT paraianmihaela explosionriskassessmentforalreadyinstalledequipment
AT jurcaadrianmarius explosionriskassessmentforalreadyinstalledequipment
AT mateidan explosionriskassessmentforalreadyinstalledequipment
AT mangusoriniuliu explosionriskassessmentforalreadyinstalledequipment