Analisis Jaringan Pipa Distribusi Air Baku WTP1 Waduk Gongseng Kabupaten Bojonegoro Provinsi Jawa Timur Menggunakan Qepanet
The WTP 1 service area is planned to meet raw water needs in the Temayang and Sukosewu Districts with a raw water supply of 150 l/s. The research objective is to plan a pipeline network to help the people of Temayang and Sukosewu Districts meet their clean water needs. The pipeline network is planne...
Main Author: | Yulia Indriani |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2023-08-01
|
Series: | Rekayasa Sipil |
Subjects: | |
Online Access: | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/1034/596 |
Similar Items
-
Perencanaan Jaringan Air Bersih di Desa Bolok Kecamatan Kupang Barat Kabupaten Kupang
by: Jordy Georgia Makunimau, et al.
Published: (2021-12-01) -
Analisis Kondisi Eksisting Jaringan Pipa Distribusi Air Bersih Kelurahan Simpang Rumbio, PDAM Kota Solok
by: Ridwan Ridwan
Published: (2019-08-01) -
A novel method for the inclusion of pipe roughness in the Hazen-Williams equation
by: Jaćimović Nikola, et al.
Published: (2015-01-01) -
Analisis Perencanaan dan Pengembangan Jaringan Distribusi Air Bersih di PDAM Tulungagung
by: Firga Yosefa, et al.
Published: (2017-03-01) -
Studying the Effect of Factors Influencing the Change in Hazen-Williams Roughness Coefficient of Cast Iron Pipes during Operation Period
by: Massoud Tabesh, et al.
Published: (2018-07-01)